SAN LEANDRO ADMINISTRATIVE CODE FINANCE
<br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES
<br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15
<br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California.
<br />Description
<br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)
<br />4 Plumbing Permit (Continued)
<br />Gas Piping and Oil Piping:
<br />Minimum Fee (one or two outlets)$7.15 $ 7.30 CPI
<br />Exemption: Inspection of installation of an earthquake gas shutoff valve No minimum gas piping and oil piping fee
<br />Each gas outlet over two $4.00 $ 4.10 CPI
<br />Each gas meter over one (same time and place)$5.15 $ 5.30 CPI
<br />Gas line test, each test $14.30 $ 14.60 CPI
<br />Fuel oil or liquefied petroleum gas storage tanks, demolition of new
<br />tanks and piping to building, each
<br />$7.75 $ 7.90 CPI
<br />Clothes dryer – residential, each $9.10 $ 9.30 CPI
<br />Clothes dryer – commercial, each $11.15 $ 11.40 CPI
<br />Hot Water systems, piping and equipment:
<br />Minimum fee (first device)$9.10 $ 9.30 CPI
<br />Each additional device $11.65 $ 11.90 CPI
<br />Boilers: All Sizes 75.00$ New consolidated fee
<br />To 3 h.p., each $15.95 Remove (consolidated above)
<br />Over 3 to 15 h.p., each $27.00 Remove (consolidated above)
<br />Over 15 to 30 h.p., each $30.30 Remove (consolidated above)
<br />Over 30 to 50 h.p., each $46.00 Remove (consolidated above)
<br />Over 50 h.p., each $76.55 Remove (consolidated above)
<br />Solar system, including collectors, piping, tanks and exchanger, each
<br />system
<br />$47.45 $ 48.50 CPI
<br />Energy Conservation: review of plans and/or energy forms for all buildings
<br />subject to the California Energy Commission’s conservation regulations
<br />(when not covered by building permit)
<br />Direct Cost (1) with a minimum charge of
<br />$62.00
<br />CPI
<br />5 Heating, Ventilating and Air Condition or General Mechanical
<br />Filing and Issuance Fee $92.00 plus the amount shown for each
<br />heating, ventilating, and air conditioning
<br />item of work and each general
<br />mechanical item of work
<br />CPI
<br />Plan Check, when applicable Direct Cost (1)
<br />For new Residential Construction and additions with valuations over
<br />$100,000 including all HVAC, registers, ducts, gas line and vents.
<br />10% of Building Permit Fee
<br />Each register over two $2.95 $ 3.00 CPI
<br />Heating, cooling and ventilating appliances:
<br />Gravity or forced air furnace, each (including gas fireplace inserts)$15.15 $ 15.50 CPI
<br />Residential air conditioning system $12.60 $ 12.90 CPI
<br />Unit heater, each $12.60 $ 12.90 CPI
<br />Recessed wall heater, each $12.60 $ 12.90 CPI
<br />Suspended space heater, each $12.60 $ 12.90 CPI
<br />Gas range – domestic, each $9.10 $ 9.30 CPI
<br />Gas range – commercial, each $11.20 $ 11.40 CPI
<br />Gas clothes dryer, domestic, each $9.10 $ 9.30 CPI
<br />Gas clothes dryer, commercial, each $11.20 $ 11.40 CPI
<br />Gas domestic refrigerator, each $9.10 $ 9.30 CPI
<br />Conversion burner, each $11.20 $ 11.40 CPI
<br />Circulating type room heater, each $11.20 $ 11.40 CPI
<br />Industrial and commercial heating equipment, each $15.60 $ 15.90 CPI
<br />Alterations or changes of any control system or ventilating system from
<br />original installation
<br />$12.60 $ 12.90 CPI
<br />Small burner of not over 15,000 BTU per hour, steam table sterilizers,
<br />laboratory burners, coffee urn burners, gas plates and similar devices, each
<br />$9.10 $ 9.30 CPI
<br />Fans or blowers connected to any heating system which are not part of the
<br />furnace, each
<br />$9.10 $ 9.30 CPI
<br />Commercial range hoods, including vent, each $34.20 $ 35.00 CPI
<br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs
<br />For the roughing in of sheet metal or approved circulating air pipe in connection with any heating or cooling system,
<br />including air inlet or outlet connections, registers and diffusers:
<br />$94.00 plus the amount
<br />shown for each heating,
<br />ventilating, and air
<br />conditioning item of work
<br />and each general mechanical
<br />item of work
<br />Direct Cost (1) with a
<br />minimum charge of $63.00
<br />For steam or hot water heating piping and radiators, convectors, hot water panels, steam or hot water unit heaters,
<br />clothes pressing machines of any type, and all connection to industrial and processing equipment:
<br /> 10
|