My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2014 1006
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 1006
>
4A Public Hearing 2014 1006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2014 10:59:18 AM
Creation date
10/1/2014 10:15:36 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/6/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 1006 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 1006
MO 2014-020
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WORKING DRAFT FOR HCD REVIEW <br /> <br /> <br />EVALUATION OF 2010 ELEMENT 2-37 SAN LEANDRO HOUSING ELEMENT <br />goal 59: elimination of housing constraints <br />Goal 59 was to reduce potential constraints that increase the cost or feasibility of new housing <br />development. This is one of the major purposes of the Housing Element, as defined by the State <br />Government Code, and continues to be a valid goal for 2015-2023 <br /> <br />There are nine policies under Goal 59, evaluated below. <br /> <br />Policy 59.1 ensured that the Zoning Code facilitated the production of housing for all income groups, and <br />discouraged overly restrictive or redundant requirements. This remains a valid policy, and should be <br />carried forward. The City has implemented this policy through the adoption of several new mixed use <br />zones, increases in allowable density, reduced parking requirements, modification of second unit <br />standards, and completion of many of the actions listed in Table 2-7 below. <br /> <br />Policy 59.2 was to maintain parking standards that reinforce other General Plan goals, including reduced <br />requirements where high-quality, reliable public transit is available, and where likely occupants will own <br />fewer cars (such as senior housing). The City has adopted reduced parking requirements in the <br />Downtown TOD area, recognizing the presence of BART as well as frequent bus service. Similar <br />requirements may be considered as part of the upcoming study for the Bayfair BART area. This policy <br />should be carried forward. <br /> <br />Policy 59.3 was to minimize the cost and time associated with development review and permit processing <br />while still adequately addressing community concerns. This policy has guided the provision of <br />development services for the past two decades and should be continued. The City’s One-Stop Permitting <br />Center has received awards in the past, and the City’s pre-application meetings have proven to be an <br />effective way to streamline project review. The City will continue to seek out ways to minimize cost- and <br />time-related constraints in the future. <br /> <br />Policy 59.4 was to ensure that impact fees are structured to cover only the costs associated with new <br />development, and not to cover deferred maintenance. This policy should be carried forward to ensure that <br />the City’s fees are legally defensible and equitable. The City conducts justification studies when <br />considering modifications to impact fees, and has completed the technical analysis necessary to charge <br />the maximum school impact fee allowable under law. The City has also pursued and received state grants <br />for upgrading infrastructure in areas where new housing is projected, lessening the burden on future <br />developers as well as San Leandro taxpayers. <br /> <br />Policy 59.5 states the City’s commitment to excellent customer service in the processing of residential <br />development applications. The policy affirms the City’s intent to make the development review process <br />easier to navigate for applicants. This continues to be a relevant policy and should be carried forward. <br /> <br />Policy 59.6 calls upon the City to work proactively with developers and community groups to address <br />design issues and other impacts associated with multi-family housing. The City has implemented this <br />policy through the design of Estabrook Place and Casa Verde, and more recently through the design of the <br />Cornerstone project at the BART station. Policy 58.5 remains relevant and should be carried forward.
The URL can be used to link to this page
Your browser does not support the video tag.