Laserfiche WebLink
C. Construction of the project shall remain in substantial compliance with the <br /> approved exhibits and plans. Any change to the project design, materials or colors <br /> shall be subject to the review and approval of the Zoning Enforcement Official <br /> and/or Community Development Director who shall administratively approve the <br /> changes, or shall refer the matter to the Site Development Subcommittee for <br /> review. <br /> III. ENGINEERING AND TRANSPORTATION DEPARTMENT REQUIREMENTS <br /> A. Pursuant to Government Code Section 66020, including Section 66020 (d) (1), the <br /> City HEREBY NOTIFIES the applicant for this Project that the 90-day approval <br /> period (in which the applicant may protest the imposition of any fees, dedications, <br /> reservations, or other exactions imposed on this Project by these Conditions of <br /> Approval) will begin on the date of the conditional approval of this Project. If the <br /> applicant/property owner fails to file a protest within this 90-day period, complying <br /> with all of the requirements of Government Code Section 66020, they will be <br /> legally barred from later challenging any such fees, dedications, reservations or <br /> other exactions. <br /> B. Design review fees, development impact fees, permit fees, inspection fees, and any <br /> other fees charged by the City or other reviewing agencies for the review, approval, <br /> permitting and inspection of the above listed public improvements shall be paid by <br /> the Applicant. <br /> C. A Development Fee for Street Improvements (DFSI) is required and is currently <br /> estimated to be $13,948.54. The Marina/I 880 Traffic Impact Fee is estimated to be <br /> $10,217.34 and will be due prior to issuance of the building permit. These fees are <br /> subject to change at the start of each fiscal year. <br /> D. Site Improvement Plans for all on-site and off-site improvements shall be prepared <br /> by a State of California Registered Civil Engineer and approved by the City <br /> Engineer prior to the issuance of Building Permits for the project. All <br /> improvements shall be designed and constructed in accordance with the City's <br /> Design Standards, Specifications and Standard Plans, unless otherwise specifically <br /> approved by the City Engineer. All details of site construction, including, but not <br /> limited to, on-site pavement slopes, illumination, drainage, etc., are subject to the <br /> approval of the City Engineer. <br /> E. Prior to the issuance of building permits for the project, the Developer shall obtain <br /> an Encroachment Permit from the Engineering and Transportation Department for <br /> any work within public right of way. <br /> F. Applicant shall remove any broken and uplifted sidewalk, driveway, curb and <br /> gutter along the full project frontage and shall construct new City standard <br /> sidewalk driveway, curb and gutter in the same location and alignment as the <br /> existing curb and gutter. Applicant shall remove any unused driveways and <br /> construct new City standard sidewalk, curb and gutter in the same location and <br /> Agreement to Conditions August 12,2014 <br /> PLN2014-00019 Page 4 of 9 <br />