OayCAP2 <br /> EMT surface mount conduit and wire will be provided and installed onto the existing <br /> structure with straps in surface mounted configuration--and a maximum of up to twenty- <br /> five (25)feet of underground trenching will be provided in planter and %" PVC underground <br /> conduit and wire will be installed from structure to new concrete base of EVSE. <br /> ChargePoint 4000 Series Charging Stations <br /> CT4C7$Wall Maufv <br /> 94,40141V0 +-p <br /> ffiV <br /> CUD:ABA.cTxptgstallan <br /> y <br /> • Additional ABM or <br /> Site Host Provided Services <br /> a) The Site Host may also opt to self-perform additional scope beyond Installation Profile <br /> Option#1,#2,or#3.This additional scope, if needed,is referenced as Exhibit C of this <br /> document. <br /> b) If upon the site survey conducted by ABM, it is determined that there is additional <br /> required work beyond the scope detailed in Installation Profile Options#1,#2, or#3 <br /> above,ABM will provide an additional estimate for costs to complete the EVSE <br /> installation.These proposals, if desired, will be added as Exhibit B to this Agreement, <br /> while Site Host approval is included as Exhibit A of this document. <br /> c) In the event that the Site Host's site does not have sufficient electrical infrastructure to <br /> support the addition of EV charging infrastructure,ABM may offer options or potential <br /> solutions that would help reduce or balance current electrical loads within a facility. <br /> Some options are designed to free up electrical capacity while others are designed to <br /> minimize peak load spikes and their resulting demand fees.Any such solutions will be <br /> implemented only upon Site Host approval. <br /> d) In the case of additional services by either party,ABM will cooperate with the Site Host <br /> to coordinate satisfactory completion of the installation of the EVSE pursuant to the <br /> requirements of the project. <br /> • ABM Exclusions and Qualifications <br /> Unless specifically noted otherwise: <br /> a) Electrical design work to accommodate non-standard configurations is excluded and will <br /> be charged as additional as required, with agreement of Site Host. <br /> b) Electrical permit, plan check fees, and utility charges are excluded and must be paid by <br /> Site Host where required. <br /> c) Pricing is based on existing electrical system having adequate physical space and <br /> amperage available. <br /> Bay Area Charge Ahead Project 2-Approval to Proceed I July 30,2014 I page 5 <br />