Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF SERVICES <br /> PROJECT DESCRIPTION <br /> In 2010, a conceptual plan was completed to renovate Siempre Verde Park. The proposed improvements <br /> are the end results of public meetings hosted by the Recreation and Human Services Department to gather <br /> comments from the surrounding community. <br /> The scope of work for this contract is to develop construction-ready plans, specifications and cost estimates <br /> (PS&E) based on the design development documents for the subject project. Work shall include the <br /> development of plans for demolition, site layout, landscaping, grading, irrigation, utilities, storm water <br /> treatment, erosion control and structures as detailed below. <br /> The City's Project Manager will coordinate with San Leandro Building and Safety Services for the <br /> application of building permits needed for the construction of this project. Consultant shall provide plans, <br /> specifications, costs estimates and calculations as required for the issuance of a building permit. <br /> CONTRACT SERVICES <br /> 1.0 Conceptual Design <br /> Not included–completed previously <br /> 2.0 Design Development(30% PSE) <br /> Not included–to be completed as part of a separate contract. <br /> 3.0 Construction Documents <br /> Geotechnical Report <br /> Consultant shall provide a geotechnical report that provides recommendations for site pavements, <br /> compaction, earthwork, seismic and foundation design criteria <br /> Deliverables: Hardcopy of geotechnical report <br /> 3.01 Background Plan Development <br /> Revise Design Development Plan per City direction received during Phase 2.0. Prepare and distribute <br /> CAD site plan to be used as a background by all disciplines. <br /> Deliverables: N/A <br /> 3.02 60% Construction Drawings <br /> Prepare 60%completion-level drawings using City standard title block format: <br /> Landscaping and Site Layout Plans <br /> - Cover Sheet <br /> - Existing Conditions/Demolition Plan <br /> -Grading Plan <br /> - Layout and Materials Plan <br /> - Planting Plan (to show trees and planting areas. Individual shrubs will not be shown until 100% <br /> submittal.) <br /> Consulting Services Agreement between January 22, 2015 <br /> City of San Leandro and Harris Design—Exhibit A Page 15 of 23 <br />