Laserfiche WebLink
• <br /> - Irrigation Plan (to show point-of-connection, mainline routing, and valve locations. heads and <br /> laterals will not be shown until 100%submittal.) <br /> - Site Construction Details <br /> - Site Detail Plans for play area and any other detailed areas, such as the prefabricated restroom <br /> Civil Plans <br /> - Erosion and Sediment Control Plan <br /> -Wet Utilities Plan (to include water, sanitary sewer, and storm drainage) <br /> - C3 Stormwater Treatment Plan <br /> - Offsite Improvements and Street Restriping Plan <br /> - Details provided at 60%design level <br /> Electrical Plans <br /> - Plans, details, and diagrams for future electrical services such as park lighting, restroom, water <br /> well (if applicable) and irrigation controller <br /> Deliverables: 60% Construction Drawings. Drawings shall be 36" by 24" and be submitted as five sets of <br /> hardcopies and electronically in AutoCAD format. <br /> 3.03 60% Specifications <br /> Prepare Draft Technical Specification sections in City Standard Green Book or CSI format. City will be <br /> responsible for preparation of General Conditions and all front-end boilerplate. <br /> Deliverables: 60%technical specifications in CSI format submitted as Microsoft Word files <br /> 3.04 60% Cost Estimate <br /> Prepare Draft Estimate of Probable Construction Costs. Compare with project funding amount. If <br /> necessary, explore scope modifications with Staff to conform estimate to budget. <br /> Deliverable: 60% level cost estimate sent electronically in Microsoft Excel <br /> 3.05 Staff Review Meeting <br /> Meet with Staff to review 60% submittal, collaborate on design changes and refinements, and receive <br /> direction for proceeding with 100% construction document phase. <br /> Deliverables: Meeting notes (either as photocopies or electronically in Microsoft Word or as PDFs) <br /> 3.06 100% Construction Drawings and Structural Calculations <br /> Prepare Final Draft drawings to the 100%completion level. Also, Consultant shall provide signed and <br /> stamped structural calculations for proposed improvements for which they are required, such as the <br /> gateway arch, handball practice wall, and shade structure. Consultant shall also provide a letter from a <br /> Structural Engineer stating that he/she has reviewed the plans and found they meet the intent of the <br /> structural design <br /> Deliverables: 100% Construction Drawings. Drawings shall be 36" by 24"and be submitted as five sets of <br /> hardcopies and electronically in AutoCAD format. Also provide one hardcopy of structural calculations and <br /> certification letter from Structural Engineer. <br /> 3.07 100% Specifications <br /> Consulting Services Agreement between January 22, 2015 <br /> City of San Leandro and Harris Design—Exhibit A Page 16 of 23 <br />