My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2015 0518
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0518
>
10A Action 2015 0518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:58:41 AM
Creation date
5/13/2015 9:41:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/18/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0518 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0518
PowerPoint 10A Action 2015 0518 Bayfair Transit Village
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0518
Reso 2015-098
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Third Phase: Plan Development <br />Deliverables <br />Time Frame <br />same information by item or action, phasing, likely funding/financing source(s), and responsible <br />departments/agencies. <br />R+A will integrate content into a completed Implementation section of the TOD Specific Plan, <br />which will include a list of measurable actions to implement goals of the Specific Plan (including <br />Zoning Code and/or General Plan amendments). <br />Task 3.3 Public Review of Draft TOD Plan. Based on CAC and TAC input, R+A will prepare a <br />Draft TOD Specific Plan <br />December 2016 <br />Public Review Draft TOD Specific Plan and circulate for formal public review and comment. During <br />(Redline and Clean Public <br />the public review period, City staff and CAC members will also conduct active public outreach by <br />Review Version) <br />presenting the Draft Specific Plan to targeted stakeholders (e.g., homeowner associations, <br />Chamber of Commerce) to solicit comments. A community workshop will also be conducted by <br />the consultant team on the Public Review Draft to receive public input. A CAC meeting will be <br />held to receive the CAC's formal and final recommendations on the Draft Specific Plan and <br />General Plan and/or Zoning Code Amendments. The Planning Commission will conduct a public <br />hearing and forward a recommendation to the City Council on the Draft Specific Plan (including <br />recommendations for Zoning Code and/or General Plan amendments). <br />Task 3.4 Final Draft. (R+A with sub -consultant support) The City Council will hold a public <br />Final TOD Specific Plan <br />March 2017 <br />hearing to adopt the Final Specific Plan. The consultant team will then prepare the Final Specific <br />(Redline and Clean) as <br />Plan (including recommendations for General Plan and/or Zoning Code amendments). This task <br />adopted by City Council <br />also includes the consultant team assisting City staff in initiating other elements of the <br />implementation program as outlined in the adopted Specific Plan. <br />RAIMI + ASSOCIATES: BAY FAIR BART TRANSIT VILLAGE TOD SPECIFIC PLAN MAY 18, 2015 1 PAGE A-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.