My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 Raimi+Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 Raimi+Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 9:22:38 AM
Creation date
6/5/2015 4:58:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/18/2015
Retention
PERM
Document Relationships
Agmt 2017 Amend No. 1 Raimi+Associates
(Amended by)
Path:
\City Clerk\City Council\Agreements\2017
Reso 2015-098
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> Commission and City Council EIR comment and adoption hearings (up to four total). <br /> A key goal of the Specific Plan and EIR will be to provide a solid and thorough basis for CEQA <br /> streamlining of subsequent projects in the plan area under the provisions of new CEQA Guidelines <br /> Section 15183.3, Streamlining for Infill Projects. Another is to document and disclose as <br /> appropriate the potentially beneficial impacts of transit-oriented development, both from an <br /> environmental impact perspective and in terms of consistency and furtherance of local and <br /> regional goals related to vehicle miles traveled and the transit/land use/emissions connection. <br /> In addition, the EIR scoping process, existing conditions inventory, and environmental analysis will <br /> inform the land use concept and specific plan policies so that the plan can be designed to "pre- <br /> mitigate" potential impacts related to the drainage and floodplain, among others resource issues. <br /> Task 4.2 EIR Transportation and Traffic Analysis. KAI will be responsible for conducting the March 2017 <br /> analysis and preparing the draft transportation section for the EIR. The preliminary analysis <br /> conducted as part of developing the (MMA & CP) will be incorporated into the EIR circulation <br /> section. To the extent feasible, KAI will coordinate the transportation section of the EIR with the <br /> 2035 General Plan Update work, but provide a more focused level of analysis for the Specific <br /> Plan with more detail around the development sites. <br /> Based on when the State releases updated State CEQA guidelines per the requirements of <br /> Senate Bill 743, KAI will also tailor the traffic impact analysis to account for either level of service <br /> or vehicle miles traveled (VMT) based analysis. The scope has been budgeted for level of <br /> service, but if the guidelines move towards VMT-based criteria, then KAI can address this with the <br /> VMT information already provided for the air quality analysis. <br /> The cumulative traffic analysis will include additional detail to quantify trip generation for the <br /> opportunity sites, which would be overlaid on the cumulative forecasts prepared as part of the San <br /> Leandro 2035 General Plan using the Alameda Countywide Projections P2013 (Plan Bay Area) <br /> model. This will ensure consistency with the analysis being conducted for the 2035 General Plan. <br /> KAI will conduct traffic analysis to identify potential impacts and mitigations associated with the <br /> preferred plan. KAI will also analyze weekday a.m. and p.m. peak hour conditions for existing and <br /> for cumulative plus project at a maximum of 10 study intersections (locations to be identified in <br /> coordination with City staff). If required, KAI would also address the CMP analysis for roadway, <br /> RAIMI + ASSOCIATES: BAY FAIR BART TRANSIT VILLAGE TOD SPECIFIC PLAN MAY 18, 2015 I PAGE A-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.