Laserfiche WebLink
4C C�ppwwEl,,% <br />BVMM..Woddig WWd=,M- <br />October 02, 2014 <br />Ingrid Lin <br />City of San Leandro <br />Engineering and Transportation Department <br />835 East 14th Street. <br />San Leandro, CA 94577 <br />Subject: Proposal for Additional Services to Locate the Pad on the East Side of the Pond <br />- WPCP Contaminated Dirt Relocation Project <br />Dear Ingrid, <br />The original vision for the project was to create an equipment storage area at the west end <br />of the existing polishing pond. During initial geotechnical evaluations of the equipment pad <br />area, additional substantial geotechnical considerations were encountered. In response to <br />these considerations, the City of San Leandro (City) requested Fugro evaluate situating the <br />new equipment pad in the east end of the polishing pond. <br />The incremental cost for this effort is $11,000. This includes a 10% markup. <br />A description of scope can be found in the attached proposal from Fugro. <br />We request you to kindly approve this request for amendment. <br />Please do not hesitate to contact us if you have any questions or require additional <br />information. <br />Sincerely, <br />CAROLLO ENGINEERS, INC. <br />AG4CAA4-,-��w 1K <br />Rick L. Chan., P.E. Zaheer Shaikh, P.E. <br />Vice President/Principal-in-Charge Project Manager <br />2700 YGNACIO VALLEY ROAD, SUITE 300 • WALNUT CREEK, CALIFORNIA 94598 • (925) 932-1710 • FAX (925) 930-0208 <br />