My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2015 0720
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0720
>
8E Consent 2015 0720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:16:47 AM
Creation date
7/30/2015 5:43:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0720 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0720
Reso 2015-129
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
FUGRO CONSULTANTS, INC. <br />May 16, 2014 <br />Proposal No. 04.7214027 <br />Carollo Engineers <br />2700 Ygancio Valley Road <br />Walnut Creek, California 94598 <br />Attention: Mr. Zaheer Shaikh <br />_rGRG <br />1000 Broadway, Suite 440 <br />Oakland, California 94607 <br />Tel: (510) 268-0461 <br />Fax: (510) 268-0545 <br />Subject: Proposal for Additional Services, WCPC Contaminated Soil Relocation Project, San <br />Leandro Water Pollution Control Plant, San Leandro, California <br />Dear Mr. Shaikh: <br />Fugro Consultants Inc. (Fugro) is formally requesting an amendment to our existing Task <br />Order No. 1. Fugro's scope of work outlined in the Task Order No. 1 between Carollo <br />Engineers and Fugro West, Inc. dated April 17, 2014 included a provision that the City of San <br />Leandro (City) was to provide a contractor to assist with sampling activities. However, the <br />contractor identified by the City has not had the availability to provide a HAZWOPER-trained <br />operator and Fugro was asked to research the availability of a different contractor with <br />HAZWOPER-trained operators which could provide the field assistance in a more timely <br />manner. <br />Fugro has identified a HAZWOPER contractor (Controlled Environmental Services, <br />CES) with availability to assist our field sampling staff. CES can provide the operator and <br />equipment next Tuesday, May 20, 2014. Fugro has a long-standing work relationship with CES <br />and they are on our approved subcontractor list. We estimate that the additional cost for Fugro <br />to retain the contractor for the one day's scope of work will be about $4,000. We have assumed <br />that three hours of overtime may be required to complete the sampling in one day. A breakdown <br />of the cost is presented below. <br />Contractor with HAZWOPER trained operator <br />(Includes 10% mark up) <br />$3,410 <br />Fugro Contractor Research and Coordination <br />$ 650 <br />$4,160 <br />A member of the Fugro group of companies with offices throughout the world. <br />
The URL can be used to link to this page
Your browser does not support the video tag.