My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2015 0921
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0921
>
8F Consent 2015 0921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2015 2:19:47 PM
Creation date
9/16/2015 6:09:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/21/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0921 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0921
Reso 2015-164
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 15-473 <br />maintenance of City-owned facilities. <br />Permits and/or Variances Granted <br />A City of San Leandro Building Permit was obtained for this work. <br />Environmental Review <br />A categorical exemption from CEQA per Section 15301(c) for ‘Existing Facilities’ was filed with <br />Alameda County for this project on July 25, 2013. <br />Code Compliance Review <br />A City of San Leandro Building Permit was obtained for this project under the 2013 San <br />Leandro Building Code based on the 2012 International Building Code. <br />Fiscal Impacts <br />A summary of the purchase order with AACPH is listed below: <br />Original Contract: $407,843.00 <br />Change Orders: $43,185.11 <br />Total Contract Amount: $451,028.11 <br />Major change order work involved the rental of portable air conditioning units to provide <br />cooling of the building during construction, and the replacement of existing rusted fire smoke <br />duct dampers that were exposed during construction. <br />The total project cost including design and construction management expenses is $645,000. <br />Budget Authority <br />This project was fully funded by $645,000 in existing appropriations of Building Maintenance <br />Funds as follows: <br />·$400,000 was appropriated to CIP account 687-18-136 as part of the mid-year budget <br />adjustment for FY 2012/13. <br />·$245,000 in additional funds from the Building Maintenance Fund for Facilities Capital <br />Improvements, 687-18-007, was transferred to account 687-18-136 in FY 2014/15 to <br />provide necessary funds for construction of the project. <br />ATTACHMENT <br />None. <br />PREPARED BY: Mark Goralka, Associate Engineer, Engineering and Transportation <br />Department <br />Page 2 City of San Leandro Printed on 9/15/2015
The URL can be used to link to this page
Your browser does not support the video tag.