My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2015 Harris Design (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2015
>
Agmt 2015 Harris Design (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2015 2:32:00 PM
Creation date
12/22/2015 2:31:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/20/2015
Retention
PERM
Document Relationships
Agmt 2017 Amend No. 1 Harris Desgin (2)
(Amended by)
Path:
\City Clerk\City Council\Agreements\2017
Reso 2015-136
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> PROJECT DESCRIPTION <br /> During the first half of 2015, Harris Design completed the PS&E documents for the rehabilitation of Siempre <br /> Verde Park based on the 2010 conceptual plan for the project. The purpose of this contract is to retain <br /> Harris Design as a consultant to the City to provide support during the construction phase of the project as <br /> outlined below. <br /> CONTRACT SERVICES <br /> 5.0 Construction Review Services <br /> 5.01 Pre-construction Conference <br /> The Consultant will attend a pre-construction conference to review the contract requirements with the <br /> contractor and City. <br /> 5.02 Shop Drawings, Samples, and Submittals Review <br /> Review and approve shop drawings, samples and other data which the Contractor is required to submit, but <br /> only for conformance with the design concept of the project and compliance with the information given in <br /> the Construction Contract Documents. Such reviews and approvals or other action will not extend to <br /> means, methods,techniques, sequences or procedures of construction or to safety precautions and <br /> programs incident thereto. Budget for this task is based on up to two reviews for each submittal.Additional <br /> reviews would be provided as additional services and should be charged to the contractor by the City.City <br /> shall be responsible for final approvals and issuing all submittal reviews to the contractor. <br /> 5.03 Requests for Information (RFI's) <br /> The Consultant shall prepare necessary interpretations and clarifications of the Construction Contract <br /> Documents in response to RFIs forwarded by the City. Responses shall be sent to the City and not to the <br /> Contractor <br /> 5.04 Requests for Quotations(RFQ's) <br /> Prepare sketches and narratives for change order quotations of additional work as requested by the City. <br /> Work also includes review of the contractor's price proposals. <br /> 5.05 Change Orders <br /> Not included. Construction bulletins,work directive changes and change orders shall be prepared by the <br /> City. <br /> 5.06 Substitutions <br /> Evaluate and determine the acceptability of substitute materials and equipment proposed by the Contractor <br /> to the extent provided in the General Conditions of the construction contract. <br /> 5.07 Site Visits <br /> Consulting Services Agreement between City of <br /> San Leandro and Harris Design Exhibit A—Page 16 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.