Laserfiche WebLink
5.10 Final Review <br /> Not included. City staff will inspect the site at the end of the project maintenance period. <br /> 5.11 Review Contractor-Supplied Verifications and Supplemental Information <br /> Receive and review maintenance and operating instructions, schedules, irrigation controller charts, and <br /> guarantees, which are to be assembled by the Contractor in accordance with the Construction Contract <br /> Documents. Such review will only be to determine that their content complies with the requirements of the <br /> Construction Contract Documents. <br /> 5.12 Record Drawings <br /> Record drawings are not part of the scope of work, since they will be provided by the Contractor. <br /> 5.13 Project Close-Out <br /> Close out and archive Consultant's project files and records. <br /> Consulting Services Agreement between City of <br /> San Leandro and Harris Design Exhibit A—Page 18 of 24 <br />