Laserfiche WebLink
Current Fee Refer <br />ence PROPOSED FEEDescription EXPLANATION <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />5 Heating, Ventilating and Air Condition or General Mechanical (Continued) <br />Fans or blowers connected to any heating system which are not part of the <br />furnace, each <br />$9.60 9.90$ CPI 2.6% <br />Commercial range hoods, including vent, each $36.00 37.00$ CPI 2.6% <br />Flues: <br />Minimum (one or two flues)$11.20 11.50$ CPI 2.6% <br />Each flue over two (each)$6.90 7.10$ CPI 2.6% <br />Ventilating System for Kitchen, Bath, etc.: <br />Minimum (one or two systems)$11.20 11.50$ CPI 2.6% <br />Each system over two $9.60 9.90$ CPI 2.6% <br />General Mechanical: <br />Incinerators – domestic, each $16.20 16.70$ CPI 2.6% <br />Incinerators – commercial/industrial, each $63.60 65.30$ CPI 2.6% <br />Garbage chutes, each $20.90 21.50$ CPI 2.6% <br />Fire dampers, each $9.60 9.90$ CPI 2.6% <br />Smog control after burners, commercial/industrial, each system $43.30 44.50$ CPI 2.6% <br />Refrigeration system – commercial/industrial, each system $55.30 56.80$ CPI 2.6% <br />Condensate drain system, each inlet $4.20 4.40$ CPI 2.6% <br />Boilers: <br />All sizes $77.10 79.10$ CPI 2.6% <br />Heat pumps, each $24.90 25.60$ CPI 2.6% <br />Cooling Systems: <br />To 100,000 BTU each $21.90 22.50$ CPI 2.6% <br />Over 100,000 to 500,000 BTU, each $34.50 35.40$ CPI 2.6% <br />Over 500,000 to 1,000,000 BTU, each $45.60 46.80$ CPI 2.6% <br />Over 1,000,000 BTU, each $56.60 58.10$ CPI 2.6% <br />Evaporative Cooler, each $22.80 23.40$ CPI 2.6% <br />Industrial Processing Equipment: <br />Ovens, dryers, cookers, fryers, kettles, etc. each $36.00 37.00$ CPI 2.6% <br />Industrial processing exhaust systems, each system $36.00 37.00$ CPI 2.6% <br />Manufactured spray booths, each $36.00 37.00$ CPI 2.6% <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission’s conservation regulations (when <br />not covered by building permit) <br />Direct Cost (1) with a minimum charge of $64.00 66.00$ CPI 2.6% <br />6 Signs <br />Filing and Issuance Fee 100.00$ CPI 2.6% <br />1 to 2 signs (non electric, attached to building)$154.00 158.00$ CPI 2.6% <br />3 to 4 signs (non electric, attached to building)$231.00 237.00$ CPI 2.6% <br />5 plus signs (non electric, attached to building)$308.00 316.00$ CPI 2.6% <br />Monument signs (each)$206.00 211.00$ CPI 2.6% <br />Electric self-contained signs, initially installed bearing Underwriters’ label of <br />approval, each <br />$29.00 29.80$ CPI 2.6% <br />Relocation or alteration of any sign electronically or mechanically, but not <br />including replacement of tubing, transformers and such parts subject to <br />failure; or shop inspection by the local inspection department in lieu of a UL <br />label (a local electrical inspection department label of approval shall be <br />required), each <br />$77.00 79.00$ CPI 2.6% <br />7 Excavation and Grading <br />Minimum Fee 75.00$ CPI 2.6% <br />Plan Checking 75.00$ CPI 2.6% <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />$73.00 PLUS the fees shown in the fee schedule as adopted by the <br />City Council except that wherever an hourly rate is shown, the rate <br />shall be equal to the Direct Cost (1) or whichever is greater. <br />$73.00 PLUS the fees shown in the fee schedule as adopted by the <br />City Council except that wherever an hourly rate is shown, the rate <br />shall be equal to the Direct Cost (1) or whichever is greater. <br />Sign permit fees are flat rate as indicated below and based on all signs being on the same property and on the same permit. Rates include <br />review and inspection <br />$97.00 plus fees shown below. Fees for sign permits are in addition to <br />any required electrical permit fees <br /> 8