My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2016 Strategic Products and Services LLC
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2016
>
Agmt 2016 Strategic Products and Services LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2016 9:30:25 AM
Creation date
5/17/2016 9:30:23 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/7/2016
Retention
PERM
Document Relationships
Reso 2016-043
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Develop a testplan to include a handful of core test cases to validate like-to-like functionality as <br /> well configurations which have changed.Define simulated failure scenario with targeted hosts for <br /> validation of fail-over. <br /> • Review and get approval from City of San Leandro IT team prior to actual migration. <br /> Phase 2:Configuration Staging and Preparation <br /> • Stage and prepare configurations of the following equipment prior to migration/cut-over: <br /> o (1)5585-X primary firewall. <br /> o (1)5515 backup firewall. <br /> o Upto(3)ASA firewalls(5505 or similar)or SOHO Cisco Routers(IOS based)at City locations <br /> which make a site-to-site IPSEC VPN connection back to the main City Hall firewall. <br /> o (2)3850 12-Port 1GE and 4 Port 1G Fiber switches in single stack configuration to perform <br /> routing decisions in PD for the new internet connection. <br /> o (2)2960-X 24-Port 1GE switches in a single stack configuration to provide Layer-2 VLANs <br /> and connectivity for the DMZs. <br /> o Configurations on existing switching/routing equipment needed to support the new <br /> Internet connectivity and failover at City Hall, Police Department, and other affected <br /> locations. <br /> Phase 3:Cutover <br /> • Provide onsite engineering for cutover: <br /> o New 10Gig Primary Internet. <br /> o BGP routing with 10G primary and 100Mb backup link. <br /> o New 5585-X primary firewall. <br /> o New 5515 backup firewall. <br /> o New 3850 switch stack at PD. <br /> o New 2960-X switch stack for DMZ at City Hall. <br /> o As required,changes to existing network equipment on the City network. <br /> • Provide remote post go-live support. <br /> Training <br /> • There is no formal training for end users or administrators included in this proposal. ExtraTeam <br /> will include knowledge transfer to Exibit A: City of San Leandro IT staff <br /> throughout the project. <br /> Documentation <br /> • ExtraTeam will provide as-built configuration files for devices which have changed as part of this <br /> project. <br /> • ExtraTeam will provide updates to the existing Visio diagram of the City network for changes <br /> that were made as part of this project. The existing City network Visio diagram which has been <br /> provided to ExtraTeam. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.