Laserfiche WebLink
MITIGATION MONITORING PLAN <br /> • <br /> IMPACT MITIGATION REQUIRED MONITORING TIMING <br /> RESPONSIBILITY <br /> 1.a. Underlying soils on the project Prior to issuance of building permits,plans for new building City of San Leandro Chief Prior to issuance of <br /> site have a high shrink-swell construction shall be submitted for review and approval to the Building Official building permits. <br /> potential due to the high Chief Building Official.Specific measures,such as shaping <br /> content of clay. building pads to provide drainage away from the building site, <br /> shall be included to address the shrink-swell characteristics of the <br /> underlying soil. <br /> 10.a,e The "Case Closure Summary" Prior to issuance of building permits,affected soil and City of San Leandro Prior to issuance of <br /> document issued by the groundwater shall be remediated to the satisfaction of the City of Environmental Services Division building permits. <br /> Alameda County Health Care San Leandro Environmental Services Division and the Regional • <br /> Services in 1996,indicates Water Quality Control Board. Alameda County Department of <br /> that due to the affected soil Environmental Health- <br /> left in place,corrective action Hazardous Materials Division <br /> should be reviewed prior to <br /> change of land use. <br /> Regional Water Quality Control <br /> Board <br /> The Asbestos Survey Report Prior to issuance of demolition permits,the applicant shall secure Bay Area Air Quality Prior to issuance of <br /> indicates that asbestos- the proper permits from the Bay Area Air Quality Management Management District demolition permits and <br /> containing material(ACM) District (BAAQMD) for removal of asbestos-containing prior to issuance of <br /> and asbestos-containing materials in the existing buildings. Written notification is building permits. <br /> construction material(ACCM) required by the EPA, National Emission Standards for <br /> have been found in several Hazardous Air Pollutants (NESHAP) Asbestos Regulations, at <br /> areas within the on-site least 10 working days prior to beginning any work for <br /> buildings that are proposed for disturbance or removal of greater than 100 square feet or 160 <br /> demolition. lineal feet of asbestos-containing materials. This notification is • <br /> processed through the BAAQMD. <br /> W <br /> Ford-MMP Page 1 <br />