Laserfiche WebLink
• • <br /> FINDING: No air quality impacts are anticipated. <br /> 4) WATER RESOURCES <br /> EFFECT: Due to the fact that the project site is currently developed and has housed the <br /> former Safeway food manufacturing plant for approximately 55 years, redevelopment of the site <br /> with an automobile dealership is not anticipated to affect on-site absorption rates or drainage <br /> patterns. There are no surface waters to which drainage might be discharged into. Project <br /> drainage would go through the existing storm drain system.No groundwater would be affected <br /> by development of the project, nor is the project site within an identified flood zone. <br /> FINDING: No impacts to water resources are anticipated. <br /> 5) BIOTIC RESOURCES <br /> EFFECT: Due to the existing developed state of the project site, no significant, rare or <br /> endangered plant or animal species currently exist. Therefore, redevelopment of the site with an <br /> automobile dealership would not result in a potentially significant impact. <br /> FINDING: No impacts to plant or animal species are anticipated. <br /> 6)NOISE <br /> EFFECT: The project site is located in an urban area which is completely developed with <br /> retail, manufacturing, other automobile dealerships and auto-related uses. Marina Boulevard is a <br /> major arterial and exists as a 4-6 lane divided roadway in the vicinity of the project site. <br /> Typically,the only potentially significant noise generated by an automobile dealership is the <br /> noise associated with servicing of vehicles (air compressors,hydraulic equipment, etc.). The <br /> service bays are proposed to be located at the rear of the project site. There are no sensitive noise <br /> receptors in the vicinity of the project. Short-term construction noise impacts would occur <br /> during demolition, site preparation and construction. <br /> MITIGATION: To reduce the construction noise effects,the City will require <br /> construction contractors to limit noisy construction activities to the least noise-sensitive times of <br /> the day and week(e.g., 7:00 a.m. to 6:00 p.m., Monday through Friday and Saturday from 8:00 <br /> a.m. to 5:00 p.m.). No construction is permitted on Sunday. <br /> FINDING: This change has been required in, or incorporated into the Project and will <br /> avoid potentially significant environmental impacts as identified in the Initial Study. <br /> 3 <br /> 15 <br />