My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2016 1107
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1107
>
8D Consent 2016 1107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 5:16:59 PM
Creation date
11/2/2016 11:27:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/7/2016
Retention
PERM
Document Relationships
Agmt 2016 WRECO CSA
(Approved)
Path:
\City Clerk\City Council\Agreements\2016
Reso 2016-142
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and 10/18/2016 WRECO for Annual Street Overlay/Rehabilitation 2016-17 Project Exhibit A – Page 5 of 5 <br />Task 5.1 – Final Plans Consultant will revise the plans based on comments received from the 100% Submittal and prepare the Final Plans. Consultant will submit the Final Plans to the City and upon receiving approval, will sign and wet seal one full‐size copy of the plans. All plan sheets will be on City of San Leandro standard title block, to be provided in digital format by the City. Task 5.2 – Final Specifications Consultant will review the Project specifications for completeness, as prepared by the City based on any comments on the 100% Plans. Task 5.3 – Final Construction Cost Estimates Consultant will revise the Construction Cost Estimate based on comments received from the 100% submittal and based on the Final Plans and Specifications. Meetings: 100% Design Meeting after 100% Design City Comment Period, for each bid package Deliverables: Final Design Plans (6 Full-sized hard copies and PDF) to include, but not limited to, roadway plans and profiles, cross-sections at 100 foot intervals, pavement markings, pavement striping, pavement delineations, construction details, curb ramp designs, for each bid package Final Construction Estimate, for each bid package Schedule: Bid Package #1: One week after 100% Design Meeting for BP#1 Bid Package #2: One week after 100% Design Meeting for BP#2 Task 6 – Engineering Services during Bidding and Construction Task 6.1 – Respond to Requests for Information/Clarification When directed by the City, Consultant will respond to contractors’ request for clarification or information.
The URL can be used to link to this page
Your browser does not support the video tag.