Laserfiche WebLink
• Preparation of CAD backgrounds for area of work based on as -built drawings provided by City and <br />limited field reconnaissance is included, however extensive field measuring to document existing <br />conditions is not included. <br />• Agency or utility permitting plan check or review fees (to be paid by City) <br />• Value engineering or constructability reviews conducted outside of A&E (architect & engineer) <br />team. <br />• Design of a project substantially exceeding the construction cost budget of $4,436,000 or <br />substantially exceeding timeline stated above. <br />• Printing and delivery will be charged as reimbursable expenses and are in addition to the basic <br />scope fee amounts. <br />Consulting Services Agreement between City of San Leandro and 10/3/2016 <br />Indigo Hammond + Playle Architects for Police Bldg. & So. Offices Modifications Exhibit A — Page 20 of 27 <br />