The streets were selected based on their Pavement Condition Index rating, and by visual inspection of road <br />surface deficiencies. The pavement design will include pavement fabric, where applicable, to increase the <br />strength of the structural section. Additionally, at San Leandro Boulevard, the design will include flattening <br />of the cross -slope of the roadway where the existing pavement thickness allows. <br />Along with pavement construction, the project will address ADA accessibility along the selected street <br />segments and new curb ramps and crossings will be constructed where required. ADA compliant curb <br />ramps and street crossings will be designed at all corners of a four-way intersection, and at two crossings <br />of a "T" intersection. <br />This contract is for consulting services to develop construction level drawings for two bid packages for the <br />Annual Street Overlay/Rehabilitation 2016-17 Project, as described below. <br />Task 1 — Project Management <br />Consultant shall manage his work under this contract in a manner consistent with the standards observed <br />by a competent practitioner of the profession in which Consultant is engaged. <br />Task 1.1 — Proiect Schedule <br />Upon receiving the Notice to Proceed (NTP) and meeting with the City, Consultant will prepare a detailed <br />project Schedule which will expand upon the Preliminary Schedule included with this proposal. The <br />schedule will identify the critical path items, review times, and milestone submittals. Consultant will review <br />the Project Schedule on a monthly basis and update and issue the revised schedule as necessary. <br />Task 1.2 — Kickoff Meeti <br />Upon receiving the NTP, Consultant will coordinate a Project Kickoff Meeting with the City. The purpose of <br />the meeting will be to confirm which streets would be included in the design, discuss issues that the City <br />would like to bring to the attention of the design team, and to finalize the Project Schedule. <br />Task 1.3 — Project Meetings and Conference Call Meetings <br />Consultant will participate in up to five (5) conference call meetings and up to three (3) Project meetings. <br />The conference call meetings will be held to primarily coordinate design activities among the design team. <br />A summary of the Project progress and outstanding coordination items will be discussed in the beginning of <br />the meeting so that City staff participating in the call does not have to stay on the line for the detailed <br />coordination discussion among the design team members. <br />The meetings will be held after receiving comments from each of the following submittals: <br />• Preliminary design <br />0 70% <br />• 100%. <br />Consultant will discuss any comments that require clarification from the City and obtain agreement on the <br />design team's proposed methods to address the City's comments. Consultant will document and distribute <br />the minutes of the meetings. Consultant will also submit monthly invoices and progress reports to the City <br />to document our progress. <br />Consulting Services Agreement between City of San Leandro and 10/18/2016 <br />WRECO for Annual Street Overlay/Rehabilitation 2016-17 Project Exhibit A — Page 2 of 5 <br />