My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2016 WRECO CSA
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2016
>
Agmt 2016 WRECO CSA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:34:40 AM
Creation date
11/17/2016 5:14:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/7/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 1107 RG
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 1107
8D Consent 2016 1107
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 1107
Reso 2016-142
(Message)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5 — Final Design <br />Task 5.1 — Final Plans <br />Consultant will revise the plans based on comments received from the 100% Submittal and prepare the <br />Final Plans. Consultant will submit the Final Plans to the City and upon receiving approval, will sign and wet <br />seal one full-size copy of the plans. All plan sheets will be on City of San Leandro standard title block, to be <br />provided in digital format by the City. <br />Task 5.2 — Final Specifications <br />Consultant will review the Project specifications for completeness, as prepared by the City based on any <br />comments on the 100% Plans. <br />Task 5.3 — Final Construction Cost Estimates <br />Consultant will revise the Construction Cost Estimate based on comments received from the 100% <br />submittal and based on the Final Plans and Specifications. <br />Meetings: 100% Design Meeting after 100% Design City Comment Period, for each bid package <br />Deliverables: Final Design Plans (6 Full-sized hard copies, PDF, and AutoCAD file) to include, but not <br />limited to, roadway plans and profiles, cross-sections at 100 foot intervals, pavement markings, pavement <br />striping, pavement delineations, construction details, curb ramp designs, for each bid package <br />Final Construction Estimate (including Microsoft Excel file), for each bid package <br />Schedule: Bid Package #1: One week after 100% Design Meeting for BP#1 <br />Bid Package #2: One week after 100% Design Meeting for BP#2 <br />Task 6 — Engineering Services during Bidding and Construction <br />Task 6.1 — Respond to Requests for Information/Clarification <br />When directed by the City, Consultant will respond to contractors' request for clarification or information. <br />Consulting Services Agreement between City of San Leandro and 10/18/2016 <br />WRECO for Annual Street Overlay/Rehabilitation 2016-17 Project Exhibit A — Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.