My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-008
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 2:01:24 PM
Creation date
1/24/2017 10:02:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
1/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0117 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0117
8E Consent 2017 0117
(Amended)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0117
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />Section 4 - Operations and Maintenance Program <br />D.13.(iv) Operation and Maintenance Program., The SSMP must include those <br />are appropriate and applicable to the Enrollee`s system: <br />(a) Maintain an up-to-date map of the sanitary sewer system, showing all <br />manholes, pumping facilities, pressure pipes and valves,. and applicable <br />facilities; <br />(b) Describe routine preventive operation and maintenance activities by staff <br />a system for scheduling regular maintenance and cleaning of the sanitary <br />frequent cleaning and maintenance targeted at known problem areas. The <br />(PM) program should have a system to document scheduled and conduct <br />orders; <br />elements listed below that <br />gravity line segments and <br />storm water conveyance <br />and contractors; including` <br />sewer system with more <br />Preventative Maintenance` <br />d activities, such as work <br />(c) Develop rehabilitation and replacement plan to identify and prioritize system deficiencies <br />and <br />implement short-term and long-term rehabilitation actions to address each deficiency. The program <br />should include regular visual and TV inspections of manholes and sewer pipes, and a system for ranking <br />the condition of sewer pipes and scheduling rehabilitation. Rehabilitation and replacement should focus <br />on sewer; pipes that are at risk of collapse or prone to more frequent blockages due to pipe defects. <br />Finally, the rehabilitation and replacement plan should include'a capital improvement plan that <br />addresses proper management and protection of the infrastructure assets. The plan shall include a time <br />schedule for implementing the short and long term plans plus a schedule for developing the funds <br />needed for the capital improvement plan; <br />(d) Provide training on a regular basis for staff in sanitary sewer system operations, maintenance, and <br />require contractors to be appropriately trained; and <br />(e) Provideequipment and replacement part inventories; including identification of critical replacement <br />pa its <br />Page (13 <br />to all map holders on a regular basis. <br />Prioritized Preventive Maintenance <br />
The URL can be used to link to this page
Your browser does not support the video tag.