Laserfiche WebLink
Year 2 Project Number Project Name Amount <br />subtotal All Annual Projects 12,910,000 <br />2018.2600 Boat Harbor Decommission: Rip Rap 2,300,000 <br />2017.0540 Storm Water Trash Capture Ph 3 1,000,000 <br />2018.5200 Storm Drain Video Inspection 300,000 <br />2019.5610 Pedestrian Crossing Improvements 250,000 <br />2008.0170 Family Aquatics Center Competition Pool 5,500,000 <br />2014.0482 Police Bldg & South Office Modifications 4,600,000 <br />2018.2400 Marina Mulford Branch Library Construct (2500 sq ft)2,500,000 <br />2018.2440 Casa Peralta Renovation Ph 1 1,300,000 <br />2018.1250 South Office Meeting Room 1,150,000 <br />2016.0700 Neptune Drive Shoreline Flood Protection 500,000 <br />2013.0180 Police Dept. Range Upgrade 235,000 <br />2018.1800 Public Park Wifi Phase 2 100,000 <br />2018.3080 Downtown Park Construction 3,000,000 <br />2005.0010 Chabot Park Playground and Amphitheater 1,250,000 <br />2018.4640 Peralta Ave SS Upsize 1,000,000 <br />2018.6010 WPCP Roof Replacement 300,000 <br />2018.4630 Marina Blvd SS diversion at Cherry 100,000 <br />2018.4600 Sybil Ave SS Diversion 70,000 <br />Total 38,365,000 <br />13