Laserfiche WebLink
Year 3 <br />Project Number Project Name Amount <br />subtotal All Annual Projects 12,960,000 <br />2016.0490 Manor Blvd Pedestrian Improvements 2,750,000 <br />2003.0590 Washington Manor Park Picnic Area Renova 390,000 <br />2018.5200 Storm Drain Video Inspection 300,000 <br />2018.2440 Casa Peralta Renovation Ph 2 3,250,000 <br />2018.3820 Traffic Safety Imp at RR crossings 300,000 <br />2009.0175 Tennis Court Renovation Phase 2 (Heath)100,000 <br />2018.4660 Beverly Ave SS Upsize 1,000,000 <br />2018.4680 Farrelly Drive SS Upsize at Dorchester 500,000 <br />Total 21,550,000 <br />14