Production Casing Installation, Seal, and Development Observation—At critical times, observe reaming of <br /> the pilot hole, installation of the production casing and screens, test pumping, and other well development <br /> operations. Laboratory fees for water quality analyses of samples collected during the pumping tests are <br /> not included as part of this task. <br /> Aquifer Test Analysis and Summary Report Preparation—Determine a safe sustained yield for the well. <br /> Prepare a completion report summarizing information gathered during well construction and testing, <br /> including an as-built construction diagram of the well. <br /> 5.08 Substantial Completion Review <br /> Hams Design will conduct an inspection to determine if the work is substantially complete, and will prepare <br /> a punch list of incomplete or unacceptable work items. Should the project be determined by Harris Design <br /> to be substantially complete, a notice of substantial completion will be prepared and issued to the City so <br /> they can issue it as necessary to the Contractor. <br /> Deliverable shall be a list of items to be included on the City's punch list to be issued to the Contractor. <br /> 5.09 Follow-Up Substantial Completion Review <br /> Should the project not be determined to be substantially complete, the Contractor shall satisfactorily <br /> complete the punch list items and issue a notice that all punch list items have been completed. Upon <br /> receipt of this notice, a second review will be held to determine if the completed work is acceptable. Once <br /> the work has been deemed substantially complete, Harris Design will recommend to the City that notice <br /> shall be given to the Contractor indicating authorization to begin the maintenance period. Any further <br /> reviews necessary to deem the project substantially complete shall be provided as additional services. <br /> 5.10 Final Review <br /> Not included. City staff will inspect the site at the end of the project maintenance period. <br /> 5.11 Review Contractor-Supplied Verifications and Supplemental Information <br /> Receive and review maintenance and operating instructions, schedules, irrigation controller charts, and <br /> guarantees,which are to be assembled by the Contractor in accordance with the Construction Contract <br /> Documents. Such review will only be to determine that their content complies with the requirements of the <br /> Construction Contract Documents. <br /> 5.12 Record Drawings <br /> Record drawings are not part of the scope of work, since they will be provided by the Contractor. <br /> 5.13 Project Close-Out <br /> Close out and archive Consultant's project files and records. <br /> 5.14 Plan Revisions <br /> Revise plans and specifications due to unforeseen conditions or changes in project scope, including: <br /> • Replacement of the flagstone paving at the Tai Chi area with concrete paving <br /> • Design of a custom concrete mounting for the 2016, 1992 and 1959 dedication plaques <br /> • Review layout of additional boulders added to the project scope of work <br />