Laserfiche WebLink
of the existing theater in the South Offices Building as outlined under Task 5 below to convert it into a <br /> community meeting space. <br /> This renovation project involves relocating non-essential functions of the San Leandro Police Department <br /> (SLPD)from the existing Public Safety Building to the South Offices Building. Approximately 6,700 SF of <br /> the 9,800 SF South Offices Building will be improved to house the Traffic Division, Records Division, and <br /> several sections of the Criminal Investigations Division. The remaining 3,100 SF of the South Offices will <br /> be renovated into a community meeting space and includes the existing theater and its associated offices, <br /> dressing rooms and restrooms. The vacated areas of the existing Public Safety Building will be <br /> reconfigured to house an expansion of the Communications Division and supporting spaces, improving <br /> roughly 3,900 SF of existing space. <br /> The Consultant shall evaluate the condition of the HVAC system, electrical system, telecom system, <br /> lighting, fire alarm system, sprinkler system, security system and standby generators for both buildings. <br /> Improvements shall be designed to meet current code requirements, recommendations from the 2014 <br /> Facilities Assessment Report, the needs of the San Leandro Police Department, and the proposed uses of <br /> the community meeting space. The design scope of work will include, but is not limited to, adding a gym <br /> and locker rooms in the South Offices Building; moving the Uninterruptible Power System from the server <br /> room in the South Offices to the Public Safety Building; expanding the server room in the Public Safety <br /> Building; miscellaneous site improvements within the Civic Plaza area in front of the Public Safety Building <br /> for accessibility and aesthetic purposes; providing code compliant restrooms in both buildings; constructing <br /> a second egress for the South Offices Building; and security gate and fencing to the south of the South <br /> Offices Building. <br /> Modifications to the 2014 conceptual design will be made under Task 1, Final Design Confirmation. Every <br /> improvement considered will be evaluated based on public safety functionality, security, cost, and life cycle <br /> cost assessment (LCCA). The design shall meet all State Building Code and regulatory requirements, <br /> including those for Essential Services Buildings when applicable, in the most direct and cost-effective <br /> manner possible. Consultant shall employ an "extended survivability" design approach that is specifically <br /> geared to provide a level of emergency preparedness beyond code minimums. <br /> Desiqn of the project shall not exceed the construction cost budget of$5,436,000 (for building <br /> improvements, site work and indirect costs) by more than 4%. <br /> Task 1 —Final Design Confirmation <br /> Conduct kick-off meeting with all involved City staff including those from the Police Department, Public <br /> Works maintenance, and Information Services. Review elements of the conceptual design and discuss any <br /> changes required to meet current needs and conditions including, but not limited to; 1) providing a traffic <br /> window to the new public lobby in the South Offices and/or relocating the proposed traffic division closer to <br /> the public counter; 2) relocating the new Live Scan room to the proposed easterly interview room in the <br /> South Offices; 3) removal of the wall between the break room and the kitchen in the South Offices; 4) have <br /> proposed exercise and locker rooms accessible to all City staff and 5) additional tenant improvements to <br /> the theater space (use to be determined). <br /> Amendment No. 1 to <br /> Consulting Services Agreement between City of San Leandro and 4/4/2017 <br /> Indigo Hammond + Playle Architects for Police Bldg. &So. Offices Modifications Page 2 of 10 <br />