My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2017 Amend No. 1 to Indigo/Hammond & Playle Architects, LLP Project No. 2014.0481
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2017
>
Agmt 2017 Amend No. 1 to Indigo/Hammond & Playle Architects, LLP Project No. 2014.0481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 1:15:30 PM
Creation date
7/14/2017 12:52:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/3/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0703 RG + CS
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0703
10B Action Items 2017 0703
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0703
Agmt 2016 Indigo Hammond + Playle
(Amended)
Path:
\City Clerk\City Council\Agreements\2016
Reso 2017-093
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Discuss other changes as may be required for the Server Room, Dispatch, Traffic Division, Records <br /> including Live Scan and Criminal Investigations Divisions. Discuss phasing and staff move-ins required. <br /> Discuss furnishings layout and method of procurement, meet with City of San Leandro Chief Building <br /> Official to review any relevant code updates since 2014 and any impact on design. Revise design <br /> documents accordingly, update cost estimate and project schedule, and conduct follow-up with City staff to <br /> review and approve the design. In event of any budget overage, identify list of value engineering (VE) <br /> opportunities for discussion with committee and selection of which to implement. <br /> Meetings: Includes 1 meeting with SLPD Facility Committee, 1 meeting with City of San Leandro Chief <br /> Building Official, and walking tour of South Offices Building and Police Department Building. <br /> Timeline: Completion within 5 weeks of the Notice to Proceed to be sent out after approval of Contract <br /> Amendment No. 1 <br /> Deliverables; Updated plans constituting the final conceptual design for approval, including project Phasing <br /> Plan. Provide meeting notes. <br /> Task#2— Prepare Construction Documents—60% PS&E <br /> Review documentation available for South Offices Building and Police Department Building. Conduct <br /> engineering analysis of existing building systems including: architectural; structural, mechanical, electrical; <br /> and security. Based on input received in the Final Design Confirmation under Task#1 and architect's and <br /> engineer's own quality control review, prepare working drawing plans, specifications and estimate (PS&E) <br /> to the 60% stage of development for the major categorical remodel work as follows: building interior walls <br /> and finishes; general accessibility and code compliance; normal and emergency power; uninterruptible <br /> power supply (UPS), data/telecommunications, IT server rooms, HVAC, plumbing, CCTV surveillance, <br /> access control and security electronics including CCTV; and hazmat remediation, if any is required. <br /> Areas of improvement include but are not limited to Server Room, Dispatch, Traffic Division, Records <br /> including Live Scan and Criminal Investigations Divisions. Criminal Investigations Division components <br /> include Youth and Social Services such as school resource officers; Juvenile Detectives; Counseling <br /> Services; and Community Support Services. Dispatch will include CAD workstation layouts, lead <br /> dispatcher, and supervisor's office break area. Other elements of SLPD operations shall be shown as <br /> required. <br /> Parking availability and access will be indicated. Construction phasing requirements as necessary to <br /> ensure continuous 24/7/365 operations will be identified. Operational security of the SLPD will be provided <br /> especially at safe and secure points of public access at South Offices Building (business hours), Police <br /> Department Building (after hours), shared use of toilet rooms in the South Offices (if applicable), etc. Other <br /> electronic security improvements are included. Conduct any furnishings coordination including that required <br /> for CAD workstations in Dispatch. <br /> Meet with City staff once during the design process and once to receive plan review comments. As a result <br /> of 60% cost estimate review, finalize selection of any value engineering (VE) items still open for discussion <br /> with committee. <br /> Amendment No. 1 to <br /> Consulting Services Agreement between City of San Leandro and 4/4/2017 <br /> Indigo Hammond + Playle Architects for Police Bldg. &So. Offices Modifications Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.