Laserfiche WebLink
itemized responses shall be provided for review comments on the 30%, 60% and 90% documents. Provide <br /> support to City staff who will present the meeting space design to City Council <br /> Key design features and goals for the new community meeting space include: <br /> • Demolition of the existing restrooms behind the stage and the creation of new code compliant <br /> restrooms. <br /> • Incorporation of the existing restrooms closest to the building entrance from E. 14th Street as part <br /> of the future SLPD space <br /> • Food preparation area <br /> • General storage space <br /> • New ceiling finishes <br /> • Resilient flooring <br /> • New furniture (provide allowance in cost estimate) <br /> • Data ports and power outlets on the floor of the meeting area <br /> • Fire alarms/sprinklers <br /> • Retain wood paneling where they currently exist in the theater <br /> • Removal of stage lighting and installation of an appropriate lighting system. <br /> • No new windows for the meeting space are anticipated <br /> • No new entrance for the meeting space is required. The entrance off of E. 14th Street will remain. <br /> • New audio-visual equipment including a video wall-based display, signal routing, distributed audio, <br /> sound reinforcement and a control system. <br /> • Accessible secondary egress <br /> • HVAC system modifications <br /> • Partial slab demolition and replacement <br /> • Miscellaneous structural modifications to support new mechanical or plumbing <br /> • Miscellaneous modifications to existing lighting, power and data systems <br /> Meetings: Two meetings with City staff and any invited public members to review the design. <br /> Timeline: The timeline for the 30% plans shall be the same as that for the Final Design Confirmation <br /> drawing under Task 1. The 60%, 90% and final plans, specifications and estimates shall follow the same <br /> timeline as Tasks 2, 3 and 4, respectively. <br /> Deliverables: 30%, 60%, 90% and final plans, specifications and estimates, the formats for which shall be <br /> the same as those outlined under Tasks 1 through 4. The bid documents shall be written such that the <br /> improvements for the community meeting space is an additive bid item. <br /> Deliverables <br /> Drawings and technical specifications shall be clear, complete, and buildable. All information required to <br /> build the project shall be shown. If required information is not shown in the details, then the location of said <br /> information shall be clearly noted. Details, plans, elevations, etc. shall be arranged and numbered on the <br /> sheets in a regular consistent pattern. Per the Public Contract Code, the specifications shall not call for a <br /> Amendment No. 1 to <br /> Consulting Services Agreement between City of San Leandro and 4/4/2017 <br /> Indigo Hammond + Playle Architects for Police Bldg. & So. Offices Modifications Page 5 of 10 <br />