Laserfiche WebLink
Meetings: Includes 2 meetings with SLPD Facility Committee, 1 meeting with City of San Leandro Chief <br /> Building Official. <br /> Timeline: Completion within 10 weeks after Task#1. <br /> Deliverables: Working Drawing Plans, Specifications and Estimate (PS&E) to the 60% level of completion, <br /> including project Phasing Plans. Includes calculations, material sample boards, cut sheets and <br /> manufacturer's literature of products and systems included in the design. Includes itemized response to <br /> comments received in Final Design task. Provide meeting notes. <br /> Task#3—Prepare Construction Documents—90% PS&E <br /> Based on input received in the 60% PS&E review and architect's and engineer's own quality control review, <br /> prepare working drawing plans, specifications and estimate (PS&E) to the 90% stage of development and <br /> submit to the City of San Leandro Chief Building Official, including to any outside third party plan reviewer, <br /> for review and comment. Provide itemized response to comments received in 60% review. Meet with City <br /> staff to receive plan review comments. <br /> Meetings: Includes 1 meeting with SLPD Facility Committee, 1 meeting with City of San Leandro Chief <br /> Building Official. <br /> Timeline: Completion within 4 weeks after Task#2. <br /> Deliverables: Working Drawing Plans, Specifications and Estimate (PS&E) to the 90% level of completion, <br /> including project Phasing Plans. Includes updated calculations, material sample boards, cut sheets and <br /> manufacturer's literature of products and systems included in the design. Includes itemized response to <br /> comments received in 60% PS&E review. Provide meeting notes. <br /> Task#4— Prepare Construction Documents— Final PS&E and Permitting <br /> Based on input received in the 90% PS&E review and architect's and engineer's own quality control review, <br /> make final revision to working drawing plans and specifications and submit the requisite number of wet- <br /> signed documents for final review and approval, stamping and signature by City of San Leandro City <br /> Engineer. Provide itemized and final response to all comments received in 90% review. <br /> Meetings: None. <br /> Timeline: Completion within 4 weeks after Task#3. <br /> Deliverables: Final Plans and Specifications and Estimate (PS&E) including project Phasing Plans. <br /> Task#5— Prepare PS&E to Convert Theater to Community Meeting Space <br /> Prepare plans, specifications and estimates for the conversion of the theater area to community meeting <br /> space. The documents can be part of the same PS&E sets related to the expansion of the SLPD. As with <br /> Tasks 1 through 4, the documents shall be prepared based on comments and input from City staff, and <br /> Amendment No. 1 to <br /> Consulting Services Agreement between City of San Leandro and 4/4/2017 <br /> Indigo Hammond + Playle Architects for Police Bldg, &So. Offices Modifications Page 4 of 10 <br />