Laserfiche WebLink
CITY OF SAN LEANDRO <br />RE: Exhibit A -CONSISTENCY MEMORANDUM FOR THE SLTC MIXED-USE PROJECT (PLN16-oo67) <br />JULY 3.7, 2017 <br />Potential Impact <br />'. <br />ProjectTable 3: Relevant Potential <br />2002 General Plan Policies/Mitigation <br />Measures* and 2007 TOD Strategy EIR <br />Mitigation Measures <br />Corresponding 2016 General Plan <br />Policies/Mitigation Measures - - <br />Compliance <br />of ambient air quality <br />• Watering of active construction <br />and all air pollutants. This should be <br />reduce air pollutants. As <br />standards. <br />areas at least twice daily. <br />done by: <br />such, the proposed project <br />• Watering or covering of <br />(a) Requiring construction and grading <br />would comply with Policy <br />stockpiled debris, soil, sand, or <br />practices that minimize airborne dust <br />EH -3-4. <br />other materials that can be <br />and particulate matter; <br />blown by the wind. <br />(b) Ensuring that best available control <br />• Covering of all trucks hauling <br />technology is used for operations that <br />sand, soil, and other loose <br />could generate air pollutants; <br />materials, or requiring all trucks <br />(c) Encouraging energy conservation and <br />to maintain at least two feet of <br />low -polluting energy sources; <br />freeboard. <br />(d) Promoting landscaping and tree <br />• Paving, or application of water <br />planting to absorb carbon monoxide and <br />or non-toxic soil stabilizers, on <br />other pollutants; and <br />all unpaved access roads, <br />(e) Implementing the complementary <br />parking areas, and staging areas <br />strategies to reduce greenhouse gases <br />at construction sites. <br />identified in the Climate Action Plan. <br />• Daily sweeping of all paved <br />access roads, parking areas, and <br />staging areas if visible soil <br />material is carried onto adjacent <br />public streets. Hydroseeding or <br />application of non-toxic soil <br />stabilizers to inactive <br />construction areas. <br />• Enclosing, covering, and <br />watering twice daily (or <br />application of non-toxic soil <br />binders) all exposed stockpiles <br />of dirt and sand. <br />• Limiting traffic speeds on <br />unpaved roads to 35 mph. <br />• Installing sandbags or other <br />erosion control measures to <br />prevent silt runoff to public <br />roadways. <br />• Replanting of vegetation in <br />disturbed areas as quickly as <br />possible. <br />