My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-096
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 1:52:30 PM
Creation date
7/24/2017 1:09:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0717 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
5A Public Hearings 2017 0717
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO- <br />RE: Exhibit A -CONSISTENCY MEMORANDUM FOR THE SLTC MIXED-USE PROJECT (PLN16-oo67) <br />JULY 17, 2017 <br />Table 3: Relevant Potential Project Impacts <br />and General Plan EIR Mitigation Measures <br />Potential Impact <br />2oo2 General Plan Policies/Mitigation <br />Corresponding 2016 General Plan <br />Compliance <br />Measures* and 2007 TOD Strategy EIR <br />..Policies/Mitigation Measures <br />Mitigation Measures <br />- <br />control measures for reducing <br />construction emissions. <br />General Plan EIR Mitigation Measure <br />General Plan Policy LU -6.05: Provide a <br />The project would be a part <br />K2: Require any future Specific Plan <br />mix of land uses, site planning and <br />of the SLTC Mixed -Use <br />and/or Area Plan forthe General Plan's <br />design practices, and circulation <br />project, which provides a mix <br />Focus Areas to incorporate trip reduction <br />improvements in the BART Station area <br />of land uses adjacent to the <br />strategies and other transportation <br />that maximize transit ridership and the <br />San Leandro BART Station. <br />control measures that reduce the <br />potential to reduce vehicle miles <br />Therefore, the project is in <br />potential for emissions. <br />traveled (VMT). <br />compliance with General <br />Plan Policy LU -6.o5. The <br />project also provides <br />pedestrian and bicycle <br />improvements such as <br />pedestrian walkways and a <br />two-lane, 20 foot bicycle <br />path on the east side of the <br />project site. <br />Implementation of <br />TCM #12: The TOD Strategy Plan <br />General Plan Policy EH -3.2: Promote <br />A traffic analysis determined <br />the TOD Strategy <br />Implementation Matrix includes <br />strategies that help improve air quality <br />the location of circulation <br />could result in <br />Streetscape Improvements and <br />and reduce greenhouse gas emissions by <br />improvements and analyzed <br />significant impacts if <br />Pedestrian Circulation Actions D1 and <br />reducing the necessity of driving. These <br />impacts to pedestrians and <br />Transportation <br />D5. Strategy D2 recommends <br />strategies include more reliable public <br />impacts of increased trip <br />Control Measures <br />conducting detailed traffic analysis and <br />transportation, carpooling and <br />generation on the project <br />(TCM) are not <br />engineering studies to determine the <br />vanpooling programs, employer <br />site. Therefore, the project is <br />implemented. <br />location of potential improvements to <br />transportation demand management <br />in compliance with Policy <br />circulation. Strategy D5 calls for detailed <br />(TDM) programs, better provisions for <br />EH -3.2. See the Traffic and <br />traffic analysis to determine the <br />bicyclists and pedestrians, and <br />Transportation discussion <br />feasibility of lane configurations of East <br />encouraging mixed use and higher <br />below. <br />1gthStreet between the San Leandro <br />density development around transit <br />Creek and West Estudillo Street. <br />stations. <br />TCM #1g: The TOD Strategy Plan <br />Implementation Matrix includes Traffic <br />Action E1, which recommends the <br />development of high-quality and direct <br />pedestrian connections between <br />development and BART, Bus Rapid <br />Transit (BRT), and other transit systems. <br />Implementation of <br />General Plan EIR Mitigation Measure <br />General Plan Policy EH -3.4: Require <br />The project is subject to site <br />the TOD strategy <br />K1: As recommended bythe BAAQMD, <br />new development to be designed and <br />plan review. As discussed <br />could result in <br />the following practices should be <br />constructed in a way that reduces the <br />below in the Air Quality <br />significant impacts if <br />required during all phases of <br />potential for future air quality problems, <br />section, the project would <br />it leads to violations <br />construction for major projects in the <br />such as odors and the emission of any <br />utilize construction best <br />City: <br />management practices to <br />
The URL can be used to link to this page
Your browser does not support the video tag.