BID SUMMARY
<br />
<br />BID OPENING Desilva Gates Construction, LP
<br />DATE: August 10, 2017 Date Approved:7/6/2017 11555 Dublin Boulevard
<br />TIME: 3:00 p.m.Prepared by:M. Goralka Dublin, CA 94568
<br />LOCATION: City Clerk's Office Phone: (925) 829-9220 Phone: Phone:
<br />Fax: (925) 803-4263 Fax: Fax:
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COSTITEM COST
<br />ENGINEER'S ESTIMATE
<br />ITEM COST
<br />PROJECT TITLE:
<br />PROJECT NO.:
<br />BID NO.:
<br />QUANTITY
<br />WPCP Asphalt Replacement
<br />2015.0260
<br />16-17.018
<br />This document is a summary of bids received for the subject project and are
<br />provided only as a convenience. Listing of a particular bid is not a finding that
<br />such bid has been found to be responsive or accepted as complete by the City.
<br />An award of contract, if any, is subject to approval of the City Council and/or the
<br />City Manager. Contractors should refer to the contract documents for bidding
<br />information.
<br />13 Utility Supply Trench - Occupancy
<br />D (1"Ø air, 1"Ø water) per Section
<br />306-8.6
<br />40 LF $105.00 $4,200.00 $180.00 $7,200.00 $0.00 $0.00
<br />14 Service Risers (Air / Water) per
<br />Section 306-8.6 (Stockpile)
<br />48 EA $175.00 $8,400.00 $1,800.00 $86,400.00 $0.00 $0.00
<br />15 Unclassified Fill per Section 300-4 180 CY $50.00 $9,000.00 $50.00 $9,000.00 $0.00 $0.00
<br />16 Subgrade Grading, Tilling, and
<br />Stabilization per Section 301-3.2
<br />9,700 SY $12.00 $116,400.00 $95.00 $921,500.00 $0.00 $0.00
<br />17 Cement for Soil Stabilization per
<br />301-3.2
<br />350 TN $175.00 $61,250.00 $140.00 $49,000.00 $0.00 $0.00
<br />18 Field Inlet per Section 303-1 2 EA $5,500.00 $11,000.00 $5,000.00 $10,000.00 $0.00 $0.00
<br />19 Replace Inlet Grate per Section
<br />303-1
<br />3 EA $2,500.00 $7,500.00 $4,000.00 $12,000.00 $0.00 $0.00
<br />20 Utility Box Adjustment per Section
<br />301-1.6
<br />75 EA $100.00 $7,500.00 $1,000.00 $75,000.00 $0.00 $0.00
<br />21 Manhole Adjustment per Section
<br />302-5.8
<br />3 EA $1,500.00 $4,500.00 $10,000.00 $30,000.00 $0.00 $0.00
<br />22 Electrical Vault Lid Adjustment per
<br />Section 301-1.6
<br />6 EA $2,500.00 $15,000.00 $8,000.00 $48,000.00 $0.00 $0.00
<br />23 Install 8" Cleanout Cover per
<br />Section 302-5.8
<br />2 EA $300.00 $600.00 $1,200.00 $2,400.00 $0.00 $0.00
<br />24 Concrete Valley Gutter per Section
<br />303-5
<br />1,670 SF $45.00 $75,150.00 $30.00 $50,100.00 $0.00 $0.00
<br />25 Concrete Slab per Section 303-5 475 SF $20.00 $9,500.00 $30.00 $14,250.00 $0.00 $0.00
<br />26 Headerboard per Section 302-5.8.1 785 LF $10.00 $7,850.00 $20.00 $15,700.00 $0.00 $0.00
<br />WPCP Asphalt Replacement Page 2 of 4 Printed 8/30/2017 @ 12:18 PM
|