My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2017 0918
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0918
>
8B Consent 2017 0918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2017 3:43:52 PM
Creation date
9/12/2017 3:43:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/18/2017
Retention
PERM
Document Relationships
Reso 2017-131
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
BID SUMMARY <br /> <br />BID OPENING Desilva Gates Construction, LP <br />DATE: August 10, 2017 Date Approved:7/6/2017 11555 Dublin Boulevard <br />TIME: 3:00 p.m.Prepared by:M. Goralka Dublin, CA 94568 <br />LOCATION: City Clerk's Office Phone: (925) 829-9220 Phone: Phone: <br />Fax: (925) 803-4263 Fax: Fax: <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST ITEM COSTITEM COST <br />ENGINEER'S ESTIMATE <br />ITEM COST <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />QUANTITY <br />WPCP Asphalt Replacement <br />2015.0260 <br />16-17.018 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the City. <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />City Manager. Contractors should refer to the contract documents for bidding <br />information. <br />27 Asphalt Concrete Paving per <br />Section 302-5 <br />2,250 TN $120.00 $270,000.00 $180.00 $405,000.00 $0.00 $0.00 <br />28 Asphalt Concrete Overlay per <br />Section 302-5 <br />70 TN $120.00 $8,400.00 $170.00 $11,900.00 $0.00 $0.00 <br />29 Asphalt Concrete Dike per Section <br />302-5.8.1 <br />275 LF $25.00 $6,875.00 $20.00 $5,500.00 $0.00 $0.00 <br />30 Microsurfacing per Section 302-15 350 SY $10.00 $3,500.00 $30.00 $10,500.00 $0.00 $0.00 <br />31 Geogrid per Section 310-3.2 2000 SY $5.00 $10,000.00 $10.00 $20,000.00 $0.00 $0.00 <br />TOTAL BASE BID: <br />REQUIRED DOCUMENTATION: <br />Agreement to be Bound <br />SUBCONTRACTORS: <br />Columbia Electric <br />Griffin Soil <br />TDW Construction, Inc. <br />SECURITIES: <br />$1,050,705.00 <br />List Sub-Contractors Here List Sub-Contractors Here <br />YES <br />$2,559,650.00 <br />10% Bid Bond <br />M.F. Maher Inc. <br />Addendum #1 <br />Acknowledgement <br />Bid Bond <br />San Leandro Local Business <br />25 % Participation <br />Good Faith Effort <br />YES <br />YES <br />NO <br />NO <br />YES <br />10% Bid Bond <br />$0.00 $0.00 <br />10% Bid Bond <br />WPCP Asphalt Replacement Page 3 of 4 Printed 8/30/2017 @ 12:18 PM
The URL can be used to link to this page
Your browser does not support the video tag.