My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-154
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 12:28:41 PM
Creation date
11/14/2017 5:44:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
11/6/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 1106 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 1106
8F Consent Calendar 2017 1106
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 1106
Agmt 2017 Flagship Facility Services, Inc. Citywide Janitorial Services
(Reference)
Path:
\City Clerk\City Council\Agreements\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Day after Thanksgiving Friday after Thanksgiving <br /> • Christmas Day December 25 <br /> If a holiday falls on a Saturday, it is observed the previous Friday. If it falls on a Sunday, it is observed the <br /> following Monday. Contractor shall be notified in advance if certain City buildings have additional closure dates. <br /> Weekly: Shall mean one day per week. <br /> MWF; TTh: Shall mean on Mondays, Wednesdays and Fridays; shall mean Tuesdays and Thursdays. <br /> Monthly: Shall mean once per calendar month. All such work performed and completed in the last week of <br /> each month. <br /> Quarterly: Shall mean every three calendar months. All such work to be performed and completed in the last <br /> week of September, December, March and June, unless otherwise arranged with the Buildings Supervisor. <br /> Semi-Annually: Shall mean every six calendar months. All such work to be performed and completed in the <br /> last week of April and October, unless otherwise arranged with the Buildings Supervisor. <br /> Annual: Shall be once per year, to be performed and completed in the last week of October, unless otherwise <br /> arranged with the Buildings Supervisor. <br /> As-Needed: Shall be determined by Buildings Supervisor. <br /> Ceramic Tile Sealer: Apply protective sealer finish which adds luster but does not build up on floor surface. <br /> Clean: Remove all dirt, stains and marks with approved cleaner. <br /> Damp Mop: Remove all surface dirt and stains with a mop and warm water containing detergent or floor <br /> cleaner as required and rinse. <br /> Damp Wipe: Remove all surface dirt with a damp cloth. <br /> Dust: Remove all loose dirt and debris. Treated cloths shall be used. <br /> Hi-Speed Buffing: Hi-speed buffing machine shall be used to apply protective sheen on wax floors where <br /> specified. <br /> Scrub: Remove all dirt, stains and marks with an approved cleaner using a floor machine equipped with <br /> scrubbing pads. <br /> Spray-Buff: Use floor machine equipped with spray buff pad. Apply solution and buff until dry. <br /> Strip: Remove accumulation of old floor finish, all surface dirt, stains and marks. Rinse and dry. <br /> Sweep: Remove all loose dirt and litter with sweeping tool and treated cloth; in places difficult to sweep, use <br /> brush or vacuum. <br /> Vacuum: Remove all surface and embedded dirt with a high efficiency filter suction cleaner (Filtering down to <br /> particles 1 micron in size). <br /> Wax: Apply appropriate number of coats of approved floor finish. <br /> Facilities, Utilities, Supplies and Equipment <br /> Exhibit A- Page 15 of 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.