Laserfiche WebLink
vehicle parking spaces and said location of the spaces shall be distributed evenly on the <br />site plan. <br />G. Prior to issuance of building permits, a green building and water-efficient landscape <br />checklist shall be completed and incorporated into building permits for this project. For <br />the—purposesof this condition,, the-checklists shall be-the-Build-itGreen GreenPointRated---- <br />checklist <br />Rated <br />checklist for New Industrial Buildings, or an equivalent rating system, as approved by the <br />Zoning Enforcement Official, and the StopWaste.Org Bay-Friendly Landscape checklist. <br />H. Prior to issuance of a building permit for Building 1, the applicant and architect shall <br />provide a revised wireless communications facility tower design that identifies a <br />decorative parapet or roof and a clock face on at least two sides of the tower feature. <br />The final design of the wireless communications facility tower shall be reviewed and <br />approved by the Zoning Enforcement Official prior to issuance of the building permit. <br />I.Prior to issuance of a Certificate of Occupancy, the applicant shall provide the Planning <br />Division with three final bound color copies of the final Sign Program as well as an <br />electronic copy in PDF or similar format. Any minor changes or revisions to the Sign <br />Program shall require approval by the Zoning Enforcement Official. Major Sign <br />Program revisions or amendments shall be referred to the Site Development Sub- <br />Commission or Board of Zoning Adjustments for consideration. <br />J.Security guard kiosks for entrances on Halcyon Drive and Washington Avenue may be <br />submitted and approved by separate building permit. The design of the security booths <br />may include a restroom and shall be consistent with the architecture of the other <br />buildings on the property. <br />V. ENGINEERING AND TRANSPORTATION DEPARTMENT <br />A. Subdivision <br />1. The applicant proposes three future lots on two existing parcels which dictates a Parcel <br />Map (two lots to three lots). The map shall be approved and recorded prior to building <br />permit issuance for proposed Building #2. Required access easements and utility <br />easements to serve the three lots shall be either shown on the Parcel Map or created via <br />separate plat maps and legal descriptions. A Shared Maintenance Agreement or similar <br />document should be prepared to govern how common area improvements will be <br />managed and maintained in perpetuity. <br />B. Preliminary Geotechnical Investigation <br />1. Building permit plans shall show that the site features (walkways, etc.) that adjoin <br />building entrances shall be designed to allow for liquefaction-induced settlement of the <br />building foundations as discussed in Section 5.1.2 of the Preliminary Geotechnical <br />Investigation without creating access obstructions for those with disabilities. <br />Agreement to Conditions August 3,2017 <br />PLN17-0003 Page 12 of 19 <br />357