My WebLink
|
Help
|
About
|
Sign Out
Home
8P Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8P Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:33:00 AM
Creation date
12/13/2017 11:33:00 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-179
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: December 18, 2017 <br />Staff Report <br />Agenda Section:File Number:17-682 CONSENT CALENDAR <br />Agenda Number:8.P. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution to Approve a Consulting Services Agreement <br />Amendment No. 1 for $86,471 with Carollo Engineers; Inc. Related to the Water <br />Pollution Control Plant Rehabilitation Project, Project No. 593-52-239 <br />SUMMARY AND RECOMMENDATIONS <br />This contract amendment provides for consulting services to assist with the close out of the <br />construction contract for the Water Pollution Control Plant (WPCP) Rehabilitation project. <br />Staff recommends the following: <br />·Approval of Amendment No. 1 to an existing consulting services agreement with Carollo <br />Engineers, Inc. that <br />o Provides construction claim support and preparation of record drawings and online <br />maintenance manuals <br />o Increases the contract amount by $86,471, resulting in a total contract amount of <br />$465,054; <br />o Extends the existing contract to December 31, 2018; <br />BACKGROUND <br />Carollo Engineers, Inc. provided construction support on the WPCP Rehabilitation project <br />beginning in late 2011 and continued past acceptance in May 2016. Shortly after acceptance of <br />the work, Carollo Engineer’s contract for construction support expired, and in September 2016 a <br />new contract was created which included two tasks carried over from the construction support <br />contract as well as new tasks to assist the City with resolving disputes with the general contractor, <br />S.J. Amoroso, Inc. This current contract expires at the end of 2017. <br />Significant progress has been made on the resolution of disputed items; however, not all items <br />Page 1 City of San Leandro Printed on 12/12/2017 <br />399
The URL can be used to link to this page
Your browser does not support the video tag.