My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent Calendar 2018 0220
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0220
>
8F Consent Calendar 2018 0220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 1:44:52 PM
Creation date
2/14/2018 1:44:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/20/2018
Retention
PERM
Document Relationships
Reso 2018-010
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
90% Deliverables <br />• 90% Plans <br />• 90% Specifications <br />• 90% Engineer’s Estimate <br /> <br />100% PS&E <br />After the City has concluded its review of the 90% PS&E submittal, Consultant will finalize the <br />plans and specifications for bidding and construction. The final PS&E package will <br />incorporate the City’s comments, as warranted after discussions with the City. The plans and <br />specifications will be signed and stamped. Final plans will be plotted on 24 pound bright white <br />paper (Oce’ Color Wave 600 Printer Media or smaller) and formatted & trimmed to 24 x 36 inches. <br />Plans will also be available in full size (24 x 36 inch) and half size (12 x 18 inch) PDF format. <br /> <br />Specifications will be provided both in Word format and PDF together with one copy wet signed <br />and stamped. <br /> <br />A final engineer’s estimate will be prepared in Excel format and be provided electronically to the City <br />in both Excel and PDF formats. <br /> <br />A final calculation package will be provided in PDF format and will be wet signed and <br />stamped. Three copies of each deliverable will be wet signed and stamped. <br /> <br />100% Deliverables <br />• 100% Plans <br />• 100% Specifications <br />• 100% Engineer’s Estimate <br />• Final Calculation Package <br /> <br />Schedule: <br />All durations are from the preceding task <br />• Task 1: Project Management and Meetings – 1 Week <br />• Task 2: Topographic Survey – 4 Weeks <br />• Task 3: Asbestos Evaluation – 4 Weeks <br />• Task 4: Value Engineering – 6 Weeks <br />• Task 5: Plans, Specifications, Estimate <br />o 30% PS&E – 8 Weeks <br />o 70% PS&E – 12 Weeks <br />o 90% PS&E – 6 Weeks <br />o 100% PS&E – 4 Weeks <br /> <br />Total: 45 Weeks <br />1094
The URL can be used to link to this page
Your browser does not support the video tag.