My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent Calendar 2018 0220
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0220
>
8F Consent Calendar 2018 0220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 1:44:52 PM
Creation date
2/14/2018 1:44:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/20/2018
Retention
PERM
Document Relationships
Reso 2018-010
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />After submittal of the 70% PS&E, CONSULTANT will schedule a meeting with the City to discuss <br />comments and review and modify design concepts based on the City and project goals. <br /> <br />70% Deliverables <br />• 70% Plans <br />• 70% Specifications <br />• 70% Engineer’s Estimate <br />• Meeting Minutes <br /> <br />90% PS&E <br />Consultant will continue work up to the 90% level. 90% plans will be plotted on full size (24 x 36 <br />inch) and half size (12 x 18 inch) in PDF format. <br /> <br />It is anticipated that the 90% plan set will include the following sheets: <br /> <br />• Title Sheet <br />• Typical Sections <br />• Key Map (General Notes and Legend) <br />• Survey Control/Project Control <br />• Layouts and Pavement Elevations <br />• Demolition and Tree Removal <br />• Profiles/Superelevation <br />• Construction Details <br />• Drainage Plans and Utilities <br />• Drainage Profiles <br />• Drainage Details <br />• Water Pollution/Erosion Control Plan <br />• Stage Construction and Traffic Handling Plan <br />• Pavement Delineation Plans <br />• Sign Plans, Details, and Quantities <br />• Stabilization Plan and Elevation <br />• Stabilization Typical Sections <br /> <br />Specifications will be further developed and provided to the City for review in both Word and PDF <br />formats. <br /> <br />The engineer’s estimate will be further refined and be made available to the City for review in PDF <br />and Excel format. <br /> <br />At the 90% level, it is anticipated that the plan set will contain all sheets necessary to bid and <br />construct the project. <br /> <br />1093
The URL can be used to link to this page
Your browser does not support the video tag.