My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent Calendar 2018 0220
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0220
>
8G Consent Calendar 2018 0220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 1:44:54 PM
Creation date
2/14/2018 1:44:52 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/20/2018
Retention
PERM
Document Relationships
Reso 2018-011
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Task 11: LOMR APPLICATION (Optional) <br />Consultant shall prepare a Letter of Map Revision (LOMR) application for the Project. <br />The LOMR application will by prepared along with as-builts of the finished project. LOMR <br />shall include the Neptune Drive improvements, the existing interior drainage documented in City <br />and District reports. Additional improvements to the north bank of Estudillo Canal by the <br />District will be included with the LOMR application to show that flooding from the south has <br />been eliminated. Wood Rodgers will summarize the Hydrology and Hydraulics results from <br />analyses conducted by the District and include as-built plans for the Canal improvements. <br /> <br />City shall pay the LOMR application fees. <br /> <br />Deliverables: Completed LOMR application. <br /> <br />Schedule: Submit application 8 weeks after substantial completion of construction. <br /> <br /> <br /> <br /> <br />1128
The URL can be used to link to this page
Your browser does not support the video tag.