My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action Items 2018 0305
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0305
>
10A Action Items 2018 0305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2018 5:02:53 PM
Creation date
2/27/2018 5:02:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/5/2018
Retention
PERM
Document Relationships
Reso 2018-019
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
124 <br /> <br />MITIGATION STRATEGY #9 <br />Strategy Name Wireless Network at Emergency Operations Center <br /> <br />Problem <br />Statement <br />Deploy high powered wireless network system at EOC <br /> <br />Current wireless network at EOC is underpowered and fails when too many client <br />devices connect. <br />Hazard(s) <br />Addressed <br />Earthquake <br />Ground <br />Shaking <br />Earthquake <br />Liquefaction <br />Current <br />Flooding <br />Future <br />Flooding Wildfire Landslide Other <br />Hazards <br />Strategy Type <br />Evaluation Program/ Operation Policy <br />Development Coordination Education/ <br />Outreach <br />Process/ <br />Implementation <br />Mechanism <br />Long-Range <br />Planning <br />Land Use <br />Planning <br />Capital <br />Planning Operations <br />Emergency <br />& Hazards <br />Planning <br />Project <br />Planning & <br />Design <br />New <br />Initiatives <br />Responsible <br />Agency <br />San Leandro Information Technology <br />Partners N/A <br /> <br />STRATEGY IMPLEMENTATION INFORMATION <br />Priority <br />(Evaluation <br />Score) <br />HIGH <br />Actions/ <br />Activities <br />This plan would include designing, procuring, and implementing new wireless <br />system based on 802.11AC technology for maximum strength and range with <br />ability to handle thousands of client devices. Internet accessibility has become <br />critical for EOC operations. <br /> <br />-Consultant will be needed for work to be completed. <br /> <br /> <br />Staff Lead Information Technology – Anton D. Batalla <br />Emergency Services Division <br /> <br /> <br />Cost Estimate <br />& Potential <br />Funding <br />Sources <br />$15,000 - $25,000 capital costs, depending on complexity of design <br />$5,000 annual maintenance <br />Capital Improvement <br />Timeline 5 years from funding <br /> <br /> <br /> <br /> <br /> <br /> <br />163
The URL can be used to link to this page
Your browser does not support the video tag.