My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN ~ 175 <br />Recommended Pedestrian Project Prioritization <br />PedID Description/Location Accessibility Safety Connectivity Walkability Funding & <br />Implementation <br />Priority <br />Points Phase <br />C13 Bancroft Middle 1 3 4 1 6 15 1 <br />C15 136th Ave/ Bancroft Ave 1 5 4 1 4 15 1 <br />B-1 C Sidewalks and Curb Ramps in the Marina 1 5 2 0 6 14 1 <br />B-12 A Hesperian Boulevard 2 3 3 1 5 14 1 <br />C1 Garfield Elementary 2 3 2 1 6 14 1 <br />C3 Cherry Grove Park 2 3 3 1 5 14 1 <br />C6 Bonaire Park 2 3 3 1 5 14 1 <br />C18 Jefferson Elementary School 1 3 4 1 5 14 1 <br />C28 Dutton Avenue/Chetland Road 1 3 3 1 5 13 2 <br />B-1 B Monarch Bay Drive and Neptune Drive Crossing 2 3 3 0 5 13 2 <br />B-4 A Replace Rolled Curbs along Manor Boulevard 1 4 4 0 4 13 2 <br />B-8 B Create More Crosswalks Along Bancroft Avenue between <br />Dutton Avenue and Callan Avenue <br />2 3 4 0 4 13 2 <br />B-9 A improve Streetscape along the Hesperian Boulevard 2 3 3 1 4 13 2 <br />B-9 B implement Bay Fair BART TOD Plan 3 1 3 2 4 13 2 <br />B-9 C Redesign Hesperian Boulevard/Bayfair Drive, Hesperian/ <br />Fairmont Drive, Hesperian/Thornally Drive intersections <br />2 3 3 0 5 13 2 <br />B-7 A Consolidate Driveways to improve Safety & Accessibility 1 3 6 0 2 12 2 <br />B-8 A Redesign Dutton Avenue/Bancroft Avenue intersection 1 3 2 2 4 12 2 <br />B-8 D Create more crosswalks along Dutton Avenue between <br />MacArthur Boulevard and East 14th Street <br />2 5 2 0 3 12 2 <br />C17 Grand Avenue/Joaquin Avenue 3 3 1 1 4 12 2 <br />C19 150th Avenue/Hesperian/Bancroft/ East 14th Street 3 1 3 1 4 12 2 <br />C22 Freeway Undercrossings for i-580/i-880/i-238 3 2 4 1 2 12 2 <br />B-7 C improve the intersection of Bancroft and Dowling 2 3 3 0 3 11 2 <br />313
The URL can be used to link to this page
Your browser does not support the video tag.