My WebLink
|
Help
|
About
|
Sign Out
Home
5B Public Hearings 2018 0319
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0319
>
5B Public Hearings 2018 0319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 11:25:31 AM
Creation date
3/14/2018 11:25:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
3/19/2018
Retention
PERM
Document Relationships
Reso 2018-021
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Reso 2018-022
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
176 ~ CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN <br />Recommended Pedestrian Project Prioritization <br />PedID Description/Location Accessibility Safety Connectivity Walkability Funding & <br />Implementation <br />Priority <br />Points Phase <br />C21 San Leandro Boulevard/Park Street/Best Avenue 3 1 2 1 4 11 2 <br />B-2 C Crossings at Williams Street and Westgate Parkway 1 3 3 0 3 10 2 <br />B-5 D Safety and Accessibility improvements at RR Crossings 2 3 3 0 2 10 2 <br />C2 Davis Street/i-880 3 3 2 0 2 10 2 <br />C5 Marina Community Center 2 1 2 1 4 10 2 <br />C20 Hesperian Boulevard/Lewelling Boulevard 2 1 2 1 4 10 2 <br />B-1 A Monarch Bay Drive Sidewalks & Crosswalks 2 1 1 0 5 9 2 <br />B-1 E Williams Street and Neptune Drive Crossing 2 1 2 0 4 9 2 <br />B-1 F West Avenue 130th Ped Facilities and Accessibility 1 2 2 0 4 9 2 <br />B-2 B Pedestrian Crossing at Timothy Drive and Davis Street 2 3 2 0 2 9 2 <br />B-1 i Pedestrian Facilities and Crossings at the intersection of <br />Fairway Drive and Doolittle Drive <br />1 3 1 0 3 8 3 <br />B-4 E improve Pedestrian Crossings at Manor and inverness 2 1 2 0 3 8 3 <br />B-6 C incorporate Streetscape improvements and Public Space <br />into Future TOD Developments <br />1 1 2 1 3 8 3 <br />B-10 B Continue Upgrading the Sidewalks Between Lewis <br />Avenue and Estudillo Avenue <br />1 3 1 0 3 8 3 <br />B-11 A Create Safe Pedestrian Connection from San Leandro to <br />Chabot Park <br />3 1 1 0 3 8 3 <br />B-11 B improve Wayfinding to Anthony Chabot Park 1 0 1 1 5 8 3 <br />B-1 H Monarch Bay Drive Mid-block Crossing near Mallard <br />Picnic Area <br />1 1 1 0 4 7 3 <br />B-5 A Washington Avenue Tunnel Pedestrian Connection 3 1 1 0 2 7 3 <br />314
The URL can be used to link to this page
Your browser does not support the video tag.