Laserfiche WebLink
CiTY OF SAN LEANDRO BiCYCLE & PEDESTRiAN MASTER PLAN ~ 177 <br />Recommended Pedestrian Project Prioritization <br />PedID Description/Location Accessibility Safety Connectivity Walkability Funding & <br />Implementation <br />Priority <br />Points Phase <br />B-6 A improve the intersection of San Leandro Boulevard and <br />Williams Street <br />2 1 2 0 2 7 3 <br />B-6 B improve the Sidewalks and Curb Ramps in Residential <br />Neighborhoods <br />1 1 2 0 3 7 3 <br />C11 San Leandro Boulevard/Washington Avenue 3 1 0 1 2 7 3 <br />C26 Davis Street/Doolittle Drive 2 3 1 0 1 7 3 <br />B-3 A improve sidewalks in Kaiser Medical Center area 1 0 1 1 3 6 3 <br />B-7 C Reconfigure Median between Broadmoor Boulevard and <br />Durant Avenue to include Pedestrian Refuge <br />1 3 1 0 1 6 3 <br />B-10 A implement Traffic Calming at the Freeway On-and-Off <br />Ramps <br />2 1 1 0 2 6 3 <br />C23 Merced Street/Wicks Boulevard 2 1 1 0 2 6 3 <br />C24 Alvarado Street/Fremont Avenue 2 1 1 0 2 6 3 <br />C25 i-238/Hesperian Boulevard 2 1 2 0 1 6 3 <br />B-1 G Pescador Point Drive Ped Facilities and Accessibility 1 0 1 0 3 5 3 <br />B-2 A Parking Lot Safety and Circulation improvements 1 1 2 0 1 5 3 <br />B-1 D Neptune Drive Crosswalks 0 0 2 0 2 4 3 <br />B-5 D improve i-880 Overpass Pedestrian Facilities 1 1 0 0 2 4 3 <br />315