My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent Calendar 2018 0416
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0416
>
8C Consent Calendar 2018 0416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 11:26:58 AM
Creation date
4/10/2018 11:26:55 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
4/16/2018
Retention
PERM
Document Relationships
Reso 2018-031
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Consulting Services Agreement between City of San Leandro and Last revised 2/21/18 Glass Architects for the Farrelly Pool Replacement Exhibit A – Page 2 of 4 <br />required, the project design should strive to incorporate the best green building/environmental <br />practices and meet as many LEED™ credits as practicable. <br /> <br /> <br />Conceptual Design Under this phase, the consultant shall: <br />• Complete a topographic study <br />• Visit site to review existing conditions <br />• Attend a startup meeting with City staff to review the current needs and requirements for <br />the facility and develop the project scope, budget and timeline <br />• Review project with applicable agencies (City Building Department, Alameda County <br />Fire Department, and Alameda County Health Services) and utilities to determine required code and utility service improvements, including NPDES stormwater treatment <br />requirements <br />• Review of available relevant project information provided by the City, including as-built <br />drawings that can be used to generate a background drawing. <br />• Provide recommendations regarding code improvements to bring the facility into <br />compliance with current codes related to the building, swimming pools and accessibility <br />requirements. <br />• Provide a cost estimate of proposed improvements, with a separate listing of the minimum required improvements to meet code requirements. <br />• Provide budget recommendations and adjustments to project scope as necessary to keep <br />within budget. <br /> Deliverables - This phase will result in the following drawings and work products: <br />• Topographic Survey <br />• Site Plan <br />• Preliminary Aquatics Plan <br />• Building Floor Plan <br />• Preliminary Building Elevations <br />• Structural, Mechanical and Electrical Building Systems Descriptions <br />• Preliminary Landscape Plan <br />• Outline Technical Specifications, including product cut sheets <br />• Project Schedule <br />• Preliminary Construction Cost Estimate <br /> <br />Design Development Phase (70% PS&E) This phase of work builds on the approved Conceptual Design from the preceding phase, and begins to develop more detail including structural, mechanical and electrical systems, building <br />finish materials, and sustainable building strategies. This phase will include several in-progress <br />meetings with the City staff as more detailed information is developed and questions arise. <br /> Deliverables - This phase will result in the following drawings and work products: • Site Plan <br /> • Aquatics Plans <br />45
The URL can be used to link to this page
Your browser does not support the video tag.