My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />Traffic Study Program <br />Description <br /> <br />Completed in the last two years: <br /> <br />In Progress: <br /> <br />Future projects: <br /> <br />Comments: <br /> <br />Sidewalk Program <br />The City operates a sidewalk program that assists property owners with making repairs <br />to the sidewalk along their frontage. Work includes meeting with property owners, <br />managing and inspecting sidewalk repair, and contracting with an outside firm for <br />sidewalk repair. Property owners only pay for the cost of the construction by the <br />contractor, staff time is paid by the City. <br /> <br />Completed in the last two years: <br />Xx sf of sidewalk? <br />Or number of requests filled? <br /> <br />In Progress: <br />The 2015-16 sidewalk project is currently in construction. <br /> <br />Future projects: <br />Program currently has a backlog of xx sidewalk repair requests. <br /> <br />Comments: <br /> <br />Building Maintenance (Public Works Operating Budget) <br />Funding for maintenance of buildings and building components including elevators, <br />movable partitions, roofing, flooring, mechanical systems (HVAC, plumbing, etc), <br />paint, parking lots, sidewalks and walkways, landscaping, irrigation systems, and <br />janitorial services. Work includes tasks required to maintain existing systems in <br />operation during their useful life but excludes wholesale replacement of systems when <br />they wear out. Work may include replacement of portions of systems when that cost is <br />less than $100,000 per project, location, or system. Scope excludes repair and <br />replacement of furniture, computer and AV equipment, and commercial kitchen <br />equipment. <br /> <br />Building Component Replacement (CIP) <br />40
The URL can be used to link to this page
Your browser does not support the video tag.