My WebLink
|
Help
|
About
|
Sign Out
Home
4A Presentations 2018 0507
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0507
>
4A Presentations 2018 0507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 12:49:42 PM
Creation date
5/2/2018 12:49:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/7/2018
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Funding for replacement or renovation of building components that have reached the <br />end of their useful life including elevators, movable partitions, roofing, flooring, <br />mechanical systems (HVAC, plumbing, etc), pools and their equipment, paint, parking <br />lots, sidewalks and walkways, landscaping, and irrigation systems. Scope excludes <br />repair and replacement of furniture, computer and AV equipment, and commercial <br />kitchen equipment. Each item of work is generally valued at greater than $100,000, <br />smaller projects are covered under the Building Maintenance line item of the Public <br />Works operating budget. Halcyon Park and Manor Park recreation center buildings as <br />well as pool locker room buildings are covered by this fund but other buildings in <br />parks are covered by the City Park Major Maintenance fund and are excluded from this <br />fund. <br /> <br />Funded to date: None, this is the initial year of the fund. <br /> <br />Completed in the last two years: <br />New Roof southern end of City Hall <br />Police Department HVAC fan replacement <br />Marina Community Center storefront window replacement <br /> <br />In progress: <br />Current contract/agreement with Climatec will address HVAC needs at ______ <br /> <br />Future projects: <br />City Hall Roof Replacement <br />Civic Center Exterior Painting <br />Boys and Girls club pool re-plastering and re-piping <br />Downtown Garage metal trim painting <br />Fire Sta 12 143rd Parking Lot Resurface <br />Fire Sta 13 Fargo Parking Lot Resurface <br />History Museum Exterior Painting <br />Main Library Exterior Painting <br />Main Library Lecture Hall Curtain – Replace <br />Main Library Estudillo/Karp Room Partition - Replace <br />Manor Branch Library Exterior Painting <br />Marina Community Center Exterior Painting <br />Marina Community Center Trash Enclosure <br />Park Building Roof Replacement <br />Senior Community Center Exterior Painting <br />WPCP Roof Replacement <br /> <br />Comments: <br />The building inventory remained static during this report period. <br /> <br />City Park Major Maintenance <br />Funding for repair and replacement of irrigation systems, playground equipment, <br />picnic areas and outdoor furniture, sport courts, fencing, bleachers, sidewalks and <br />41
The URL can be used to link to this page
Your browser does not support the video tag.