My WebLink
|
Help
|
About
|
Sign Out
Home
8P Consent Calendar 2018 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0716
>
8P Consent Calendar 2018 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 12:38:59 PM
Creation date
7/11/2018 12:38:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/16/2018
Retention
PERM
Document Relationships
Reso 2018-088
(Message)
Path:
\City Clerk\City Council\Resolutions\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Consulting Services Agreement between City of San Leandro and 12/18/2017 <br />ConvergeOne, Inc. for Cisco Firewall Upgrade Project Exhibit A – Page 10 of 11 <br />Personnel <br />ConvergeOne follows a skills-based implementation philosophy. Based on a project’s needs, <br />individuals with specific skill sets may be engaged at various phases of this project. This allows <br />ConvergeOne to provide the Customer with a specialized team to accomplish a successful <br />implementation. The ConvergeOne Project Manager is responsible for assigning and scheduling <br />engineers as needed. <br />Project Schedule <br />Project duration and end date are dependent upon ConvergeOne and Customer availability, <br />Customer readiness, and the actual start date. ConvergeOne will use commercially reasonable <br />efforts to commence delivery of services defined in this SOW within four (4) weeks from the date <br />of the Customer’s approved purchase order and signed and submitted SOW. <br />Project work required beyond the term of the Estimated Project Duration specified in this section <br />may require a ConvergeOne Change Request Form signed by both parties in accordance with the <br />Project Change Management procedures defined herein. Any extension of the project’s duration <br />for any reason other than delays caused solely by ConvergeOne may require an increase in SOW <br />pricing. <br />Change Management <br />It may become necessary to amend this SOW for reasons including, but not limited to, the <br />following: <br />➢The Customer requires changes to the scope of work to be performed and/or specifications <br />of design or services <br />➢Non-availability or change in availability of resources which are beyond either party’s <br />control <br />➢Environmental or architectural impediments or omissions not previously identified <br />In the event either party desires to change this SOW, the following procedures will apply: <br />➢The party requesting the change (either the Customer or ConvergeOne) will deliver a <br />Change Request document to the other party. The Change Request will describe the nature <br />of the change; the reason for the change and the effect the change will have on the scope <br />of work, which may include changes to the deliverables, and the schedule. The parties <br />will evaluate the Change Request and negotiate in good faith the changes to the Services <br />and the additional charges, if any, required to implement the Change Request. If both <br />parties agree to implement the Change Request, the appropriate authorized representatives <br />of the parties will sign the Change Request, indicating the acceptance of the changes by <br />the parties.
The URL can be used to link to this page
Your browser does not support the video tag.