Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised [01/09/2018] Noll & Tam Architects for Design of Mulford Marina Library Exhibit A – Page 5 of 8 <br />Consultant shall administrate stakeholder and community meetings, including preparation of agendas and meeting minutes. Meeting presentations shall describe the project, update progress and discuss design issues. Graphics/renderings shall be provided to demonstrate the objectives of the meeting. The time for a total of seven meetings has been included in the Basic Services. If additional meetings are needed, Consultant shall request written authorization before attending the meetings. Deliverables Format Final design confirmation plans: PDF Meeting notes: PDF Sketches, narratives, calculations and Final Plans: PDF and AutoCAD format Final Plans: Provide three wet-signed full-sized hardcopies in addition to the electronic files Cost estimates: PDF Technical specifications: PDF and Microsoft Word. Excluded Services The following items are excluded from the scope of work unless noted as included, but are available on the basis of additional services should they become required and as approved by the City of San Leandro: <br />• Geotechnical Report including soils testing and analysis <br />• Agency or utility permitting plan check or review fees (to be paid by City) <br />• Redesign due to Value Engineering <br />• Construction management services