My WebLink
|
Help
|
About
|
Sign Out
Home
8A Consent Calendar 2018 0723
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0723
>
8A Consent Calendar 2018 0723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2018 4:21:55 PM
Creation date
7/17/2018 4:21:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/23/2018
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised [01/09/2018] Noll & Tam Architects for Design of Mulford Marina Library Exhibit A – Page 6 of 8 <br />EXHIBIT A-1 DETAILS OF DESIGN Design shall be prepared in accordance with the California Building Standards Code as currently adopted by the City as of the date of this agreement. The scope of this agreement includes all architecture and engineering service required to complete the work. No work shown on the plans or listed in the specifications shall be ‘design build’ unless it is specifically listed herein, or approved in writing by the City. The interior portion of the fire suppression sprinkler system (if so equipped) may be design build. All exterior piping up to and including the fire service riser shall be designed under this contract. Unique, proprietary, or experimental designs and materials are prohibited unless approved by City. Technical Specification shall be CSI format. Front end specifications (administrative) shall be prepared by the City. Consultant shall prepare all other specifications. Consultant shall coordinate the work with the front end specifications prepared by the City. Performance specifications are prohibited. Specifications shall be coordinated with the plans. <br />Reports provided by City, including Geotechnical and Hazardous Materials contain recommendations for design and construction. Design work shall be done in accordance with these recommendations. Consultant shall communicate with the authors of the reports as required to clarify or understand the recommendations. The reports are not a construction documents; recommendations for construction shall be included and shown completely on the plans and in the specifications. The City shall be responsible to secure a review of the plans at 100% CD level by the geotechnical engineer and Hazardous Materials Consultant to verify conformance with the recommendations. <br /> The City has a standard door hardware specification guideline. All work shown shall conform to said guideline. The City has standard plans that indicate details of construction of many site improvements. All work where a standard plan is applicable shall conform to the standard plans unless otherwise approved by the City. Fire and intrusion alarm systems are designed by a proprietary consultant / contractor “Denelect Alarm”. Consultant shall coordinate with Denelect Alarm to incorporate design into the construction documents. Structural calculations shall be provided for the design of the vertical and lateral force resisting systems. Calculations shall include the design of joists, rafters, beams, headers, posts, columns, connections, footings, horizontal diaphragms, collectors, frames, braces, walls (in and out of plane), supports, attachments, and all other items whose design is controlled by building code requirements. Structural design shall be in accordance with the California Building standards code and the SEAONC blue book. Where conflicts exist, the more stringent shall apply. Allowable stresses for all materials shall be as published in the UBC, CBC, NDS, AISC, or other nationally recognized source. ICBO reports are acceptable.
The URL can be used to link to this page
Your browser does not support the video tag.