Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised [01/09/2018] Noll & Tam Architects for Design of Mulford Marina Library Exhibit A – Page 7 of 8 <br />The design shall comply with the Building Energy Efficiency Standards according Title 24, Part 6 of California Code of Regulation. The site shall be graded so that storm water does not drain to adjacent property. All site drainage shall be discharged in a manner conforming to the C3 requirements of the Clean Water Program.